OpenIFBCloses Dec 1, 2026

Submonitor Connect FE Electronic Motor Overload Protection Device

Los Angeles Department of Water and Power — ENGINEERING - NORTHLos Angeles, California#147097

The device must be rated for 50/60 Hz, single- or three-phase operation, with 1A minimum and 135A maximum current, covering 1HP to 700HP motors. Must record over 100 faults. Delivery must not exceed 65 calendar days and must occur between 7:30 AM and 2:30 PM, Monday–Friday, excluding holidays. Bids are valid for 90 days. Bidders must possess a valid BTRC number, VRN, or exempt tax registration. Protests must be filed in writing within 7 days of advertisement or 3 days of addendum issuance.

On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 1, 2026
Time stated in bid documents
Dec 1, 2026, 2:00 PM Pacific Time
Submission
online portal
Required submission items
1 items · full checklist with Pro

Scope of work

  • 15 units of Submonitor Connect FE Electronic Motor Overload Protection Devices
  • Adjustable overload trip class 5–30
  • Monitors ground fault, phase loss, phase unbalance, over/under voltage, over/under current
  • FOB destination to LADWP facility

Steps to Bid

  1. 1

    Click 'Express/View Interest' and then 'Respond Online' to create a bid response in ERSP.

What you'll need

Submission

Online portal

NAICS

335314

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Adjustable service factor from 1.00 to 2.00. Failure to do so renders bid non-responsive. Delivery must not exceed 65 calendar days from receipt of order. Delivery accepted only between 7:30 AM and 2:30 PM, Monday through Friday, excluding recognized holidays. Only responses submitted through ERSP will be accepted. Bidder must create a bid response in ERSP by clicking 'Express/View Interest' and then 'Respond Online'. Bids are subject to acceptance by the Department for 90 days. Payment terms: 30 calendar days after delivery and receipt of corrected invoice. Applicable discounts calculated based on invoice date, receipt date of proper invoice, material receipt date, or service date, whichever is later. Title passes at delivery point. Bid acceptance is not effective until final analysis and evaluation of all bids and issuance of a purchase order or contractual document. The Department reserves the right to award items separately or as a whole. Protests must be filed in writing to the Director of Strategic Purchasing and Supply Chain Management, LADWP, 111 N. Hope Street, Room L-43, Los Angeles, CA 90012, or via email to [email available with Pro]. Protests regarding content of solicitation documents must be filed within 7 calendar days of advertisement or 3 days from issuance of any addendum. Protests regarding award must be filed within 7 calendar days of posting of intent to award notice. All protests must be received by 4:00 PM local time. Failure to comply with requirements may result in protest being rejected. Preference is applied solely for evaluation purposes. For contracts under $150,000: 10% preference for LSB or LTE. For contracts over $150,000: 8% preference for LBE. Maximum combined preference is 12%. Affirmative action applies. Terms and conditions are incorporated by reference. The Department reserves the right to reject any and all bids.

Key dates

Questions due
Nov 30, 2026, 2:00 PM Pacific Time
Bids due
Dec 1, 2026

More from this agency

Similar bids near Los Angeles

Closing soon near Los Angeles