Summit Road Fuel Reduction Non-Commercial Thinning (NCT) – Umatilla National Forest
Forest Service — USDA-FS, CSA NORTHWEST 1Meacham, Oregon#1168495
The U.S. Work includes thinning small-diameter conifers (up to 10.0 inches DBH), hand-piling slash, and lop-and-scatter operations. Residual spacing varies by unit: 21' x 21' (100 tpa), 17' x 17' (150 tpa), 30' x 30' (45 tpa), and 35' x 35' (36 tpa). Piles must be 6’ x 6’ x 6’ minimum, covered with plastic, and placed ≥5’ from leave trees and ≥10’ from roads/trails. Slash must be lopped ≤18” deep and distributed ≤12 tons/acre. Motorized travel is restricted to existing roads; no travel on meadows or scab flats. Work must avoid wildlife features, including raptor nests, seeps, springs, and elk wallows. The solicitation is not open to the general public.
On PublicBidSearch: the original bid posting, 21 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 19, 2026
- Time stated in bid documents
- Nov 19, 2026, 10:00 AM Pacific Time
- Submission
- Documents analyzed
- 21 published · 8 analyzed
Scope of work
- Thin small-diameter conifers (≤10.0” DBH) across 172 acres in mandatory units
- Maintain 100’ buffer around seeps, springs, bogs, and elk wallows
- Keep all trails, roads, and culverts free of debris and obstructions
Steps to Bid
What you'll need
Submission
NAICS
115310
Get alerts for bids like this
New paving bids in Oregon
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Activity slash and dead/downdraft material ≤12.0 inches in diameter must be hand-piled into minimum 6’ x 6’ x 6’ piles, covered with plastic sheeting, and placed at least 5’ from leave trees and 10’ from roads, trails, and private land. Lop and scatter operations require slash to be distributed evenly at ≤12 tons per acre, lopped to ≤18” depth, and pulled back 5’ from leave trees. A 100-foot buffer is required around sensitive features. The project is located in Oregon, within the Umatilla National Forest, and is part of the Wildfire Crisis Strategy. The total area to be treated is 172 acres across mandatory units, with additional optional units available. The contractor must comply with all environmental and operational standards outlined in the DUIS and project specifications.
Documents
- SummitRoadFuelReductionNCT_Project_Area.pdf1 pages
- Unit146.pdf
- SummitRoadFuelReductionNCT_Vicinity_Map.pdf
- Unit158.pdf1 pages
- Unit147b.pdf1 pages
- Unit163.pdf1 pages
- Unit100.pdf
- Unit141a.pdf
13 more files
More from this agency
- K - 4,000-Gallon Water Tender Unit — closes Nov 20, 2026
- Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon — closes Nov 20, 2026
- Weed Thinning for Medford Forest Nursery in the Rogue River-Siskiyou National Forest — closes Dec 21, 2026
- Waste Removal and Disposal from Vault Toilets and Septic Tanks at Various Sites in Region 6 National Forest — closes Mar 31, 2031
- West Zone Mt. Hood National Forest Parent BPA — closes Apr 30, 2031
Similar open bids
- Westport Road Improvement Project – New Roadway Extension and Highway 30 Widening — Clatsop County
- ODOT Notice to Contractors #26050 – Multiple Highway and Bridge Construction Projects — Oregon Department of Transportation (ODOT)
- Headworks Road 10 Rehabilitation — City of Portland
- Highway and Bridge Construction Projects — Yammill County, OR99W Corridor Safety & Intersection Improvements — Oregon Department of Transportation (ODOT)
- Cherryville-Welches Area Chip Seal Project — Clackamas County
Closing this week nearby
- Oregon Land Use Hearings Officer Services — closes Nov 19, 2026
- Alternative Procurement for Collaborative Peer-to-Peer Learning Annotation Tool — closes Nov 19, 2026
- Marine OECM Guide Scientific and Technical Communications and Development - Sole Source — closes Nov 19, 2026
- Pharmacy Benefit Management Services (PBM) – Town of Delight, AR — closes Nov 19, 2026
- ODVA Roseburg Veterans Home CM/GC — closes Nov 19, 2026