Abbeville Ave & Sumter St. and Colleton Ave & Charleston St. Pedestrian Improvements

City of Aiken — E&UAiken, South Carolina

The City of Aiken, South Carolina is soliciting bids for pedestrian improvements at two locations: Abbeville Ave & Sumter St. (P043675) and Colleton Ave & Charleston St. (P043676). The scope includes sidewalk and ADA ramp construction, signage and striping installation, and storm system modifications. The project is funded by Federal Transportation Alternative Funds and requires compliance with federal and SCDOT regulations, including Davis-Bacon wages and Buy American provisions. A bid bond of 10% of the total bid amount is required. Performance and Payment Bonds, each for 100% of the agreement amount, will be required of the successful bidder. The completion time is 90 consecutive calendar days.

On PublicBidSearch: the original bid posting, 12 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 17, 2026
Time stated in bid documents
Nov 17, 2026, 2:00 PM Eastern Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
90 consecutive calendar days
Documents analyzed
12 published · 2 analyzed

Scope of work

  • Construct approximately 1447 SF (P043675) and 2,205 SF (P043676) of sidewalk and ADA Ramps
  • Construct modified storm system (P043676)

Steps to Bid

  1. 1

    Submit sealed proposals to the Engineering & Utilities Building, 245 Dupont Drive, Aiken, South Carolina, 29801. was Nov 17, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

    Proposals will be received until 2:00 P.M., local time, November 17, 2026.

  2. 2

    Attend the non-mandatory pre-bid meeting. was Oct 20, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    Held at the Engineering & Utilities Building, 245 Dupont Drive, Aiken, South Carolina, 29801 at 10:00 a.m., EST.

  3. 3

    Submit written clarification requests (questions). was Oct 30, 2026, 5:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

    Questions will be received until 5:00 p.m., EST.

  4. 4

    Attach verification of SCDOT pre-qualification status to the bid submittal.

    Failure to submit verification or not being prequalified will result in a non-responsive bid.

What you'll need

Bid security

Required

A contract performance bond and payment bond, each in an amount equal to one hundred percent (100%) of the agreement amount will be required of the successful bidder.

Prequalification

Required

Contract duration

90 CALENDAR DAYS

Award method

The contract will be awarded, if it is awarded, to the responsible and responsive Bidder or Bidders submitting the lowest bid.

Submission

Mail, Hand delivery

How to submit

Documents are to be enclosed in a sealed envelope, addressed to: CAPITAL PROJECTS MANAGER C/O DANI FOX ENGINEERING & UTILITIES BUILDING 245 DUPONT DRIVE AIKEN, SOUTH CAROLINA 29801 and marked: “P043675 ABBEVILLE AVE & SUMTER ST. PEDESTRIAN IMPROVMENTS AND P043676 COLLETON AVE & CHARLESTON ST. PEDESTRIAN IMPROVEMENTS ” to be opened November 17, 2026 at 2:00 P.M. If forwarded by mail or courier, the sealed envelope containing the Proposal shall be enclosed in another envelope or courier container also addressed as specified.

In person/mail: CAPITAL PROJECTS MANAGER C/O DANI FOX ENGINEERING & UTILITIES BUILDING 245 DUPONT DRIVE AIKEN, SOUTH CAROLINA 29801

Get alerts for bids like this

New concrete bids in South Carolina

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Both projects require maintenance of the construction site and adherence to all CSWPPP requirements. The work shall conform to the SCDOT Standard Plans and Standard Specifications or as clarified herein and/or the City of Aiken Engineering Design/Specifications. The project is funded in part by Federal Transportation Alternative Funds, and all federal and SCDOT requirements will apply, including Davis-Bacon Act wage requirements and Federal Highway Buy American Provisions (BABA). Contractors must be registered in the federal System for Award Management (SAM) and not be debarred. Prime Contractors must be prequalified by the South Carolina Department of Transportation (SCDOT) in the work classifications necessary to perform the full scope of work. The contract duration is 90 consecutive calendar days from the Notice to Proceed.

Documents

  • Plan_Set_P043675_Abbeville-Sumter_Signed.pdf
  • Plans_Set_P043676_Colleton-Charleston_Signed.pdf
  • TAP_P043675_P034676__Bid_Documents_final_10-08-2026.pdf41 pages
  • TAP-ATTACHMENT_1-_TAP_PO43675_P043676_LPA_RequiredProvisions_2026.pdf
  • TAP-ATTACHMENT_2-_2025_SCDOT_Standard_Specifications.pdf
  • TAP-ATTACHMENT_3-2025_Std_Spec_Significant_Changes.pdf13 pages
  • TAP-ATTACHMENT_4-Permits.pdf
  • Addendum_No_1_TAP_Sidewalk_Projects_11-3-2026.pdf2 pages