OpenIFBCloses Nov 30, 2026

Taylor Park Improvements – Phase 1

City of BloomingdaleBloomingdale, Chatham, Georgia

The City of Bloomingdale, GA, is soliciting bids for Phase 1 of Taylor Park Improvements, including construction of concrete sidewalks, removal and disposal of an existing concrete basketball court and goals, and replacement of conflicting site elements such as fencing, bleachers, and landscaping. Work must be completed within 60 calendar days from the Notice to Proceed, with a 10-day start window. The contractor must coordinate with the City Recreation Department to minimize disruption. Failure to meet the deadline incurs $500 per day in liquidated damages. Ten percent retainage will be held until final acceptance. The lump sum bid includes all labor, materials, tools, and equipment. Concrete must be ready-mixed, 4,000 psi minimum strength, and comply with Georgia Public Parks standards. Formwork, reinforcement, joints, and curing must meet ACI 301-99 and ASTM standards. The contractor is responsible for all permits, site protection, and property damage. A 'not to exceed' amount must be submitted before work begins. The contractor must provide installer qualifications demonstrating five years of successful in-service performance on similar projects.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Nov 30, 2026
Time stated in bid documents
Nov 30, 2026, 4:00 PM Eastern Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
1

Scope of work

  • Construct concrete sidewalks as per plan and specifications
  • Remove and dispose of existing concrete basketball court and goals

Steps to Bid

  1. 1

    Register with the City of Bloomingdale's procurement portal or obtain the bid package from the official website.

  2. 2

    Review the full bid documents, including the contract specifications, drawings, and instructions to bidders.

  3. 3

    Submit questions to the City of Bloomingdale's designated contact by the deadline specified in the instructions. by Nov 30, 2026, 4:00 PM

  4. 4

    Prepare and submit a sealed bid with the lump sum price, bid bond, and required forms by the due date and time. by Nov 30, 2026, 4:00 PM

What you'll need

Contract duration

60 calendar days from the Notice to Proceed

Award method

The award of the contract will be made by the Mayor and City Council of the City of Bloomingdale. Following their approval, the contractor will be issued a Notice to Proceed.

Submission

Mail, Hand delivery

NAICS

236115

How to submit

Bids must be submitted in a sealed envelope marked 'Taylor Park Improvements – Phase 1' and delivered to the City Clerk's Office at the address above. The envelope must contain the completed bid form, bid bond, and all required documentation. Electronic submissions are not accepted.

In person/mail: City of Bloomingdale, 100 Main Street, Bloomingdale, GA 31304

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Seven days are included for adverse weather. The City reserves the right to occupy and operate completed portions of the work before final acceptance. Failure to complete within the stipulated time results in liquidated damages of $500 per day. Ten percent (10%) retainage will be held until satisfactory completion. Concrete must be ready-mixed, batched, and transported per ASTM C94, with a minimum 28-day compressive strength of 4,000 psi. Formwork must meet ACI 301-99, Chapter 2, and be coated with a release agent that does not stain or impair concrete surfaces. Reinforcement bars must meet ASTM A615/A615M, Grade 60, with no less than 0.25 square inches per foot (each way). Welded wire fabric must conform to ASTM A185, located 2 inches from the top surface, with a minimum mesh size of 6x6 inches, W2.9 x W2.9. Concrete cover for reinforcement must meet ACI 301 Table 3.3.2.3. Sawcut contraction joints must be spaced no more than 10 feet on center, with cutting initiated as soon as the concrete has hardened sufficiently to prevent aggregate dislodgement. Expansion joints must be spaced at intervals of no more than 30 feet, using flexible foam filler meeting ASTM D3575, with a maximum width of 3/8 inch. Joint sealant must meet ASTM C920, Type S or M, Grade P, Class 25. Concrete must not be placed during rain, sleet, or snow. In cold weather (temperatures below 40°F), concrete must be covered with insulated blankets for a minimum of 72 hours after finishing. Calcium chloride, salt, or other antifreeze agents must not be used unless specified in the mix design. In hot weather, reinforcement steel must be covered with water-soaked burlap to prevent temperature rise. All adjacent surfaces must be protected from splatter using 6-mil poly sheets or equivalent. Curing compound must be applied immediately after finishing, must be clear, and must be approved by the City. A 'not to exceed' amount must be provided prior to work commencement. All permits must be obtained by the contractor and kept on-site. The installer must have documented experience in similar pavement work with a five-year record of successful in-service performance. The sidewalk layout plan shows a total of 53 linear feet of sidewalk, with 10-foot and 20-foot segments, and a 25-foot section. The sidewalk must match existing elevations and grades, with a maximum slope of 2%. Where adjacent to existing concrete slabs, the top of the sidewalk must be flush with the existing surface.

Key dates

Questions due
Nov 30, 2026, 4:00 PM Eastern Time
Bids due
Nov 30, 2026

Documents

  • Taylor_Park_Improvements_Phase_1_Contract_Documents.pdf6 pages

See all documents · Download with Pro

More from this agency

Similar bids near Bloomingdale

Closing soon near Bloomingdale