Texas Central Parkway Drainage Improvements (75DR2504)
City of Waco - M1612Texas#RFB2026-071
Work includes paving repairs, curb and gutter installation, and debris removal in North Flat Creek. The general contractor must self-perform 30% of the work. A 5% bid bond is required. The City reserves the right to reject any or all submissions.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 12, 2027, 2:00 PM CT
- Time stated in bid documents
- Jan 12, 2027, 2:00 PM Central Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal, mail, hand delivery
- Contract term
- 60 calendar days from the Notice to Proceed
- Documents analyzed
- 4
Scope of work
- Abandon concrete channel and corrugated metal pipe (CMP)
- Install reinforced concrete box (RCB) structures, headwalls, and wingwalls
- Construct flume and drop inlet structures
- Install riprap and concrete curb and gutter
- Repair concrete and asphalt paving
- Remove vegetation and debris upstream and downstream in North Flat Creek
Steps to Bid
- 1
Attend the pre-bid meeting (non-mandatory) on December 9, 2026, at 10:00 AM via Zoom at Official linkPro. by Dec 9, 2026, 10:00 AM
- 2
Submit questions by December 16, 2026, at 12:00 PM CT via the Bonfire portal or email to [email available with Pro]. by Dec 16, 2026, 12:00 PM
- 3
Submit a physical copy (one original, two copies, and one electronic copy on CD or USB) to the Purchasing Services Office at 1415 N. 4th Street, Waco, TX 76707, if not submitting electronically. by Jan 12, 2027, 2:00 PM
What you'll need
Contract duration
60 calendar days from the Notice to Proceed
Submission
Electronic portal, Mail, Hand delivery
NAICS
Backfill Services,, Digging,, Ditching,, Road Grading,, Rock Stabilization,, Etc.
How to submit
All submissions must be in a sealed envelope clearly marked with the bid number and title. Electronic submissions must be through the Bonfire portal. Physical submissions must include one original, two copies, and one electronic copy on CD or USB. Bids submitted by fax or email will not be accepted.
In person/mail: Attn: Melanie Wade, Purchasing Agent, 1415 North 4th Street, Waco, Texas 76707
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This project involves the abandonment of a concrete channel and corrugated metal pipe (CMP), installation of a reinforced concrete box (RCB) structure, headwalls, wingwalls, flume, riprap, and drop inlet structures in Texas Central Parkway. The City reserves the right to reject any or all submissions and may waive minor deviations. The City will not reimburse bidders for costs incurred during proposal preparation.
Key dates
- Questions due
- Dec 16, 2026, 12:00 PM Central Time
- Pre-bid meeting
- Dec 9, 2026, 10:00 AM Central Time
- Bids due
- Jan 12, 2027, 2:00 PM CT
- Expected award
- Feb 12, 2027
Documents
- ESBD_578274_1795118067435_RFB_2026-071_Bid_Package_ESBD_.pdf14 pages
- ESBD_578274_1795118095958_RFB_2026-071_Zoom_Information.pdf1 pages
- ESBD_578274_1795118124710_RFB_2026-071_Pricing_Form.pdf1 pages
- ESBD_578274_1795118147548_RFB_2026-071_Pricing_Form.xlsx
More from this agency
- Flat Creek Reuse Project Phase 1A – Request for Qualifications · closes Dec 1, 2026
- New Road Bridge Rehabilitation – RFB 2026-060 · closes Dec 17, 2026
- Roadway Anti-Icing and Deicing (Pretreatment) Services · closes Dec 18, 2026
- RFB 2026-072 Texas Central Parkway Concrete Intersections · closes Dec 22, 2026
Similar bids in Texas
- Wrong-Way Detection Systems, Maintenance, Repair, and Testing Services for the Harris County Toll Road Authority · closes Dec 14, 2026
- Widen Road - Add Lanes and Shoulders on IH 45 in Ellis County · closes Dec 1, 2026
- Maintenance and Repair of Highway US0287 in Childress County, Texas: Limestone Rock Asphalt Work · closes Dec 1, 2026
- ITB - Reinforced Concrete Box Culverts · closes Dec 3, 2026
- West Alabama Street Paving and Drainage Improvements from Buffalo Speedway to Kirby Drive · closes Dec 16, 2026
Closing soon in Texas
- Flood Retardance Project Engineering Services · closes Nov 30, 2026
- Construct TWLTL on FM 2821 in Walker County, Texas · closes Dec 2, 2026
- RFP for Microgrid · closes Dec 2, 2026
- Metal Beam Guard Fence Repair, Lubbock County, Interstate Highway 0027 · closes Dec 3, 2026
- Replacement of Front-Room and Backroom 9-1-1 Equipment · closes Dec 3, 2026