Thomas Murphy Ballroom Back-of-House and Kitchen Flooring Replacement
Georgia World Congress Center AuthorityAtlanta, Fulton, Georgia#PE-92200-RFP-2027-000000098
The Georgia World Congress Center Authority is seeking qualified flooring contractors to replace sheet vinyl flooring in the Thomas Murphy Ballroom Back-of-House corridors and existing tile in a designated kitchen with commercial-grade, safety-compliant flooring. The work includes demolition, surface preparation, installation of Altro Stronghold 30 or equivalent in the corridors, and either quarry tile with sound-control membrane or epoxy flooring in the kitchen, with both kitchen options to be priced separately. Contractors must submit a detailed proposal with a complete lump-sum cost for both areas, a technical approach, a schedule, references, and required exhibits. A mandatory site visit is required before submission. The Authority may reject any proposal or cancel the procurement at any time.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 19, 2026
- Time stated in bid documents
- Nov 19, 2026, 10:00 AM Eastern Time
- Performance bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 6
Scope of work
- Install Altro Stronghold 30 Safety Flooring or GWCCA-approved equivalent in BOH corridors.
- Provide heat-welded seams, perimeter caulking, and flooring transitions in BOH corridors.
- Install red directional floor signage in BOH corridors.
Steps to Bid
- 1
Review the full RFP and all attachments, including the amended RFP and Addendum One.
- 2
Attend the mandatory site visit on November 10, 2026, at 12:00 PM at the GWCC Sales/Events Conference Room, Building B, 285 Andrew Young International Boulevard, Atlanta, GA 30313. was Nov 10, 2026, 12:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit written questions to Erle Coleman by 10:00 AM on November 12, 2026, via email at [email available with Pro]. was Nov 12, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Review the official clarification issued on November 13, 2026, which requires separate pricing for both quarry tile and epoxy flooring in the kitchen. was Nov 13, 2026, 4:36 PM
This date has passed — confirm eligibility with the agency before bidding.
- 5
Prepare and submit one original and five copies of the proposal, plus one electronic copy on a flash drive as a single .pdf file, by 10:00 AM on November 19, 2026. by Nov 19, 2026, 10:00 AM
- 6
Seal the proposal in an opaque envelope with 'SEALED PROPOSAL' and 'RFP GWCC11226EC-Amended' clearly marked on the outside. by Nov 19, 2026, 10:00 AM
- 7
Deliver the sealed proposal to Erle Coleman at the Georgia World Congress Center Authority, 285 Andrew Young International Boulevard, NW, Atlanta, GA 30313-1591. by Nov 19, 2026, 10:00 AM
What you'll need
Submission
Mail, Hand delivery
NAICS
238990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 8 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The Georgia World Congress Center Authority (GWCCA) is soliciting sealed proposals from qualified flooring contractors for the removal and replacement of existing sheet vinyl flooring with commercial-grade, non-slip safety flooring in designated corridors of the Thomas Murphy Ballroom (TMB) Back-of-House (BOH) area, and the replacement of existing tile flooring in one designated TMB kitchen with a commercial-grade, sound-absorbent, non-porous, and slip-resistant flooring system. The Contractor shall verify all field measurements, provide a detailed technical approach, a proposed schedule, a list of comparable projects, and a complete lump-sum pricing schedule for both the BOH corridor work and the kitchen work. Proposals must include Exhibits I–V. The Authority reserves the right to reject any or all submittals, waive technicalities, or cancel the procurement at any time. A restriction of communication is in effect from the time of advertisement until final award.
Key dates
- Questions due
- Nov 12, 2026, 10:00 AM Eastern Time
- Pre-bid meeting
- Nov 10, 2026, 12:00 PM Eastern Time
- Site visit
- Nov 10, 2026, 12:00 PM Eastern Time
- Bids due
- Nov 19, 2026
Documents
- 202611_supportingdocs_PE-92200-RFP-2027-000000098-2026-11-03_15_17_36-d2ee7.xlsx
- 202611_supportingdocs_PE-92200-RFP-2027-000000098-2026-11-03_15_17_45-845054.pdf18 pages
- 202611_supportingdocs_PE-92200-RFP-2027-000000098-2026-11-09_13_47_79-a48a4.xlsx
- 202611_supportingdocs_PE-92200-RFP-2027-000000098-2026-11-09_13_47_87-0c59ed.pdf20 pages
- 202611_supportingdocs_PE-92200-RFP-2027-000000098-2026-11-10_16_30_11-c95ee9.pdf1 pages
- 202611_supportingdocs_PE-92200-RFP-2027-000000098-2026-11-13_16_36_21-844b27.pdf1 pages
Similar open bids
- Wall Replacement at Coffee Middle School — Coffee County School System
- CARPET (Annual Contract) - RFB 27-0015 — City of Columbus
- Maintenance Building Flooring Installation — Effingham County School District
- Wall Replacement at Coffee Middle School — Coffee County School District
Closing this week nearby
- Generator Set, Diesel (NSN 6115016275690) — closes Nov 19, 2026
- On-Call HVAC Services — closes Nov 19, 2026
- Grease Interceptor Maintenance, Cleaning and Inspection Services at Hartsfield-Jackson Atlanta International Airport — closes Nov 19, 2026
- Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair at Lows Mill Road — closes Nov 19, 2026
- Resurfacing of 9.35 Miles on Collins Road, Skyline Drive, Rothell Road, Lilly Lane, South Pine Street, Fig Street,… — closes Nov 19, 2026