ClosedIFB

Three Phase, Conventional, Dead-Front, Radial and Loop-Feed Padmounted Transformers

City of FarmingtonFarmington, New Mexico#27-169587

The City of Farmington is soliciting bids for five types of three-phase, conventional, dead-front, radial and/or loop-fed, 2,500kVA and below padmounted transformers. The solicitation includes 300 kVA loop (2 units), 300 kVA radial (3 units), 500 kVA loop (1 unit), 750 kVA radial (2 units), and 1000 kVA radial (1 unit). All transformers must meet the detailed electrical and mechanical specifications in Attachment A, including compliance with ANSI C57.12.26, C57.12.00, and C57.12.90 standards, 2016 U.S. DOE efficiency standards, and 95kV minimum BIL rating. Bidders must be manufacturers approved by the FEUS Standards Committee, including General Electric (USA only), ABB Power T&D, Eaton Cooper Power, Howard Industries, and Ermco, Inc. Partial deliveries are permitted if shipping costs are included in the unit price. The City will consider delivery time during evaluation. The contract is a one-time purchase with no guaranteed ordering period. Unit prices must remain firm for any future orders. The City may reject bids with delivery beyond 90 calendar days. Bidders must submit via the IonWave online system. All bids must include manufacturer name, product number or description, and delivery lead time. The City may purchase from alternate sources if the successful bidder fails to deliver. The City may terminate for cause or convenience. The City may waive technicalities.

On PublicBidSearch: the original bid posting, 13 bid documents and the agency contact (name and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Due
Nov 24, 2026
Time stated in bid documents
Nov 24, 2026, 2:00 PM Mountain Time
Submission
online portal
Documents analyzed
13 published · 5 analyzed

Scope of work

  • Supply and deliver 300 kVA 3PH Loop, 13800/7970-480/277 V, quantity 2
  • Supply and deliver 300 kVA 3PH Radial, 13800/7970-480/277 V, quantity 3
  • Supply and deliver 500 kVA 3PH Loop, 13800/7970-480/277 V, quantity 1
  • Supply and deliver 750 kVA 3PH Radial, 13800/7970-480/277 V, quantity 2
  • Supply and deliver 1000 kVA 3PH Radial, 13800/7970-480/277 V, quantity 1

Steps to Bid

  1. 1

    Register with the City of Farmington's online bidding system, IonWave.

  2. 2

    Review the bid specifications and attachments, including Attachment A, which lists the approved manufacturers.

  3. 3

    Submit questions via the IonWave system by 11/19/2026 03:00 PM (MT). was Nov 19, 2026, 3:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Complete the online bid submission form, including all required information for each line item.

  5. 5

    Attach all required documents, including manufacturer literature, exceptions to specifications (if any), and any preference certificates.

  6. 6

    Submit the bid via the IonWave online system by 11/24/2026 02:00 PM (MT). was Nov 24, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Online portal

NAICS

335918

How to submit

Bids must be submitted via the City of Farmington's online bidding system, IonWave. Mailed, emailed, or faxed bids will not be accepted. All required information must be completed in the online form, and all attachments must be uploaded through the system. The bid must be submitted by the deadline.

Get alerts for bids like this

New electrical bids in New Mexico

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Bid QuestionsQuestion Please confirm the contract duration and ordering period, required quotation validity, and how long unit prices must remain firm for periodic or additional orders.Answer This is a one-time purchaseSubmitted 11/18/2026 11:13:46 AM (MT)Question Is a separate Buy American or Buy America certificate required? If so, please identify the applicable requirement and required form.Answer Buy America is not a requirement of this bid.Submitted 11/18/2026 11:13:26 AM (MT)Question May preliminary outline drawings and guaranteed performance data satisfy Attachment A Section 2 at submission, with final design drawings and details provided after order placement? Please identify any information that must be final at submission.Answer These manufacturers have been approved by the FEUS Standards Committee and those manufacturers not listed will be rejected, but a Bidder may submit their Exceptions, but the City will make the final decision on acceptance.Submitted 11/18/2026 11:13:07 AM (MT)Question Are partial deliveries permitted, with units delivered as they become available?Answer Yes, staggered shipments are acceptable, but the shipping costs must be included in the unit cost, per the bid specifications.Submitted 11/18/2026 11:12:27 AM (MT)Question Will offers with delivery beyond 90 calendar days remain eligible for consideration? If so, what is the maximum acceptable delivery period?Answer Delivery time will be taken into consideration during evaluation.Submitted 11/18/2026 11:12:00 AM (MT)Question Please confirm whether Hitachi Energy and U.S.-manufactured GE Vernova/Prolec transformers are accepted under the ABB Power T&D and General Electric entries in Attachment A Section 20.2.Answer Acceptable as long as they meet the specifications.Submitted 11/18/2026 11:11:40 AM (MT)Question Are manufacturers outside Attachment A Section 20.2 eligible under the "equal or superior" provision in Section VI.A, despite the restrictions in Sections V.C.3 and V.L.1?

Documents

  • Bid_Invitation.pdf7 pages
  • Bid_Specifications_27-169587.pdf11 pages
  • ATTACHMENT_A_Bid_27-169587.pdf8 pages
  • Campaign_37520.pdf2 pages
  • Bid_Invitation.pdf7 pages
  • Bid_Specifications_27-169587.pdf11 pages
  • ATTACHMENT_A_Bid_27-169587.pdf8 pages
  • Campaign_37520.pdf2 pages

5 more files

See all documents · Download with Pro

More from this agency

Closing soon near Farmington