NHVH Tarr ADA & IPC Compliance – Tilton, NH
New Hampshire DOT — NHDOTTilton, Belknap, New Hampshire#81396RB
The project includes remodeling restrooms, resident rooms, and selected common areas, with a total area of approximately 16,750 square feet. Bidders must submit a 5% bid bond and a 100% performance and payment bond. The deadline for bid submission is December 2, 2026, at 2:00 PM, Prevailing Time, via the online portal. A non-mandatory pre-bid meeting is scheduled for November 12, 2026, at 10:00 AM at the site. Bidders must be qualified and registered with the State of New Hampshire.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026
- Time stated in bid documents
- Dec 2, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Documents analyzed
- 3 published · 2 analyzed
Scope of work
- Remodel shared public restrooms to meet ADA and IPC standards
- Renovate resident rooms and bathrooms for accessibility compliance
- Upgrade door openings, counters, and finishes for accessibility
- Complete work in approximately 16,750 square feet of space
- Include alternates for dining area, nurse station, and corridor
Steps to Bid
- 1
Submit the Department’s Request for Proposal (RFP) form electronically to the NHDOT Contract Office to be authorized to bid. by Nov 22, 2026
- 2
Submit all questions in writing to Aletheia Smith by November 12, 2026, at 10:00 AM. was Nov 12, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Obtain access to the online bidding portal and download plans and specifications after RFP approval. was Nov 5, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 4
Submit the bid electronically via Official linkPro by 2:00 PM, Prevailing Time, on December 2, 2026. by Dec 2, 2026, 2:00 PM
What you'll need
Submission
Electronic portal
NAICS
236220
How to submit
Proposals must be submitted electronically via Official linkPro. The bid bond must be submitted electronically at the time of bid.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Scope encompasses selective demolition, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, mechanical, plumbing, and electrical systems. Project completion date: September 17, 2027. Bids must be submitted electronically via [link available with Pro] by 2:00 PM, Prevailing Time, on December 2, 2026.
Key dates
- Pre-bid meeting
- Nov 12, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 2, 2026
Documents
- tilton-81396rb.pdf3 pages
- 81396rb.pdf2 pages
- 81396rb-addendum-01-signed.pdf21 pages
More from this agency
- Installation of Wrong-Way Countermeasures at 25 Controlled Access Interchanges — closes Dec 3, 2026
- 64 South Street Rooftop Replacements, Concord, NH — closes Dec 16, 2026
Closing this week nearby
- Enterprise Artificial Intelligence (AI) Platform Solutions — Request for Information — closes Nov 20, 2026
- E-Rate FY2027 Category 1 Internet Access and Data Transmission Service — closes Nov 20, 2026
- Independent Auditing Services for the Town of Litchfield, NH — closes Nov 20, 2026
- 2027 Cemetery and Property Maintenance Services — closes Nov 23, 2026
- Lord Hall Building Entrance Modifications at the University of New Hampshire — closes Nov 23, 2026