OpenConstructionCloses Dec 2, 2026

NHVH Tarr ADA & IPC Compliance – Tilton, NH

New Hampshire DOT — NHDOTTilton, Belknap, New Hampshire#81396RB

The project includes remodeling restrooms, resident rooms, and selected common areas, with a total area of approximately 16,750 square feet. Bidders must submit a 5% bid bond and a 100% performance and payment bond. The deadline for bid submission is December 2, 2026, at 2:00 PM, Prevailing Time, via the online portal. A non-mandatory pre-bid meeting is scheduled for November 12, 2026, at 10:00 AM at the site. Bidders must be qualified and registered with the State of New Hampshire.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 2, 2026
Time stated in bid documents
Dec 2, 2026, 2:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Documents analyzed
3 published · 2 analyzed

Scope of work

  • Remodel shared public restrooms to meet ADA and IPC standards
  • Renovate resident rooms and bathrooms for accessibility compliance
  • Upgrade door openings, counters, and finishes for accessibility
  • Complete work in approximately 16,750 square feet of space
  • Include alternates for dining area, nurse station, and corridor

Steps to Bid

  1. 1

    Submit the Department’s Request for Proposal (RFP) form electronically to the NHDOT Contract Office to be authorized to bid. by Nov 22, 2026

  2. 2

    Submit all questions in writing to Aletheia Smith by November 12, 2026, at 10:00 AM. was Nov 12, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Obtain access to the online bidding portal and download plans and specifications after RFP approval. was Nov 5, 2026

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Submit the bid electronically via Official linkPro by 2:00 PM, Prevailing Time, on December 2, 2026. by Dec 2, 2026, 2:00 PM

What you'll need

Submission

Electronic portal

NAICS

236220

How to submit

Proposals must be submitted electronically via Official linkPro. The bid bond must be submitted electronically at the time of bid.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Scope encompasses selective demolition, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, mechanical, plumbing, and electrical systems. Project completion date: September 17, 2027. Bids must be submitted electronically via [link available with Pro] by 2:00 PM, Prevailing Time, on December 2, 2026.

Key dates

Pre-bid meeting
Nov 12, 2026, 10:00 AM Eastern Time
Bids due
Dec 2, 2026

Documents

  • tilton-81396rb.pdf3 pages
  • 81396rb.pdf2 pages
  • 81396rb-addendum-01-signed.pdf21 pages

See all documents · Download with Pro

More from this agency

Closing this week nearby