Timber Retaining Wall with Culvert Construction at Camp Ripley Training Center, Little Falls, MN
Minnesota Military Affairs DepartmentLittle Falls, Minnesota#2000018804
The Minnesota Military Affairs Department is soliciting bids for the construction of a timber retaining wall and culvert installation at Camp Ripley Training Center, Little Falls, MN. The scope includes site prep, timber wall construction, culvert installation, backfill, and final grading. Bids are due by 10:00 AM on November 23, 2026, in the local time zone (CT).
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Nov 23, 2026, 10:00 AM CT
- Time stated in bid documents
- Nov 23, 2026, 10:00 AM Central Time
- Submission
- electronic portal
Scope of work
- Install culvert for stormwater drainage
- Perform site preparation and excavation
- Backfill and grade to final profile
- Comply with military site access and safety protocols
Steps to Bid
What you'll need
Submission
Electronic portal
NAICS
238290, 238299
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
The Department of Military Affairs is seeking a responsible contractor to provide labor, equipment, materials, transportation, and all incidentals necessary to construct a timber retaining wall and install a culvert at Camp Ripley Training Center (CRTC), 15000 HWY 115, Little Falls, MN 56345. Refer to 3RFB Exhibit C, A1: Drawings (Plans) and A2: Details, in the Sample Contract for full specifications, duties, and scope of work. The contractor must comply with all applicable federal, state, and local regulations, including environmental and safety standards. The project is located at the CRTC facility and is subject to military operations and access restrictions.
Key dates
- Bids due
- Nov 23, 2026, 10:00 AM CT
Similar open bids
- CSAH 10 Improvement Project — Chisago County, MN
- 2026 Stormwater Improvements — City of Shoreview
- 2026 Drainage Improvements — City of Maple Grove
- 2026 Drainage Improvements — City of Maple Grove
- Blooming Prairie Box Culvert Replacement — Minnesota DOT
Closing this week nearby
- General Engineering Consultant (GEC) for Preconstruction Services Master Contract — closes Nov 19, 2026
- Alternative Cementitious and Re-Recycled Materials in Concrete Pavements Research — closes Nov 19, 2026
- Construction Communications, Engagement & Business Outreach for Robert Street Reconstruction Project — closes Nov 19, 2026
- Clean River Partners - Cannon River Fish Passage Improvements — closes Nov 20, 2026
- Designation of Official Newspaper for 2027 — Redwood County, MN — closes Nov 20, 2026