Town of Middlefield Town Campus Sidewalk Project
Middlefield, Town ofConnecticut#40047
The project is funded through the CCGP with $581,256 for construction, but this RFP is for the design phase only, with a maximum budget of $50,000. Questions must be submitted by December 4, 2026, at 4:00 PM ET. The selected firm will develop construction-level plan documents for submission to CTDOT.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 11, 2026
- Time stated in bid documents
- Dec 11, 2026, 12:00 PM Eastern Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 5 items · full checklist with Pro
Scope of work
- Design and development of construction-level plan documents for sidewalk installation
- Survey and site assessment for sidewalk improvements
- Permitting and coordination with CTDOT for construction approval
- Preparation of engineering plans and specifications for sidewalk project
- Development of construction documents for use by future contractors
Steps to Bid
- 1
Review the solicitation document and all attached files, including the RFP and the referenced 'Middlefield Sidewalk Connectivity Grant RFP for Construction_Rebid_112026.pdf'.
- 2
Submit any questions to Robin Newton by December 4, 2026, at 4:00 PM ET. by Dec 4, 2026, 4:00 PM
- 3
Prepare and submit a complete proposal, including all required forms and documentation, by December 11, 2026, at 12:00 PM ET. by Dec 11, 2026, 12:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
541330, 541370
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 5-item required-submittals checklist
Cancel anytime · no card to browse
Project details
0170-3513GR. The Town has executed a Commitment to Fund Letter with the CT Department of Transportation. No additional funds are expected. The scope includes survey, design, plan development, and permitting services. The work is limited to the design and documentation phase only.
Key dates
- Questions due
- Dec 4, 2026, 4:00 PM Eastern Time
- Bids due
- Dec 11, 2026
Documents
- 40047_Nov_21_26_solicitation_doc.pdf5 pages
Similar bids in Connecticut
- City RFP - Long Ridge Road Sidewalk Phase 2 · closes Dec 10, 2026
- Preston Public Works Salt Shed Foundation · closes Dec 8, 2026
- New Fairfield Downtown Sidewalk and Streetscape Improvements II · closes Jan 8, 2027
- Cove Road Sidewalk and Pedestrian Safety Improvement Project - Request for Proposal · closes Dec 10, 2026
- Hamden Walkable Sidewalks DOT #61-153 · closes Jan 5, 2027
Closing soon in Connecticut
- Contracted Caseworker for Geriatric Social Work Clinical Services · closes Nov 30, 2026
- RFP - Annual Fireworks Show · closes Dec 1, 2026
- Animal Control Facility Improvements · closes Dec 1, 2026
- Technology Equipment Procurement — Bid Package #2 · closes Dec 3, 2026
- RFP for Executive Search Consulting Services for New Superintendent · closes Dec 3, 2026