Fort Halifax Park Shoreline Stabilization Preliminary Scoping, Permitting, and Engineering Design
Town of WinslowMaine
The project covers approximately 1,800 linear feet of shoreline. The selected firm will conduct site assessments, alternatives analysis, and develop preliminary designs and cost estimates. The maximum project budget is $75,000, funded through the Maine Community Resilience Partnership (CRP) Community Action Grant. Proposals must include a detailed scope, itemized costs, hourly rates, and a not-to-exceed fee. The consultant must maintain $1M per occurrence/2M aggregate CGL, $1M auto liability, statutory workers’ comp, and $1M professional liability insurance. The Town must be named as an additional insured. The Town reserves the right to reject all proposals or request interviews.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 1, 2027
- Time stated in bid documents
- Jan 1, 2027, 11:59 PM Eastern Time
- Submission
- mail, hand delivery, email
- Documents analyzed
- 2 published · 1 analyzed
Scope of work
- Alternatives analysis and selection of preferred stabilization approach
- 30% preliminary engineering design for preferred alternative
- Cost estimating and permitting requirements identification
- Final report and roadmap for future funding and construction
Steps to Bid
- 1
Review the RFP and Addendum 1
- 2
Submit questions to Steve Soucy or Marc Amaral by December 15, 2026 by Dec 15, 2026, 11:59 PM
- 3
Prepare and submit a complete proposal by January 1, 2027 by Jan 1, 2027, 11:59 PM
What you'll need
Contract duration
TBD
Submission
Mail, Hand delivery, Email
NAICS
541330
How to submit
Proposals must be submitted in a sealed envelope labeled 'RFP - Fort Halifax Park Shoreline Stabilization' and delivered to the Town of Winslow, 114 Benton Avenue, Winslow, ME 04901. Email submissions must be sent to [email available with Pro] with the subject line 'RFP - Fort Halifax Park Shoreline Stabilization - Proposal'.
In person/mail: 114 Benton Avenue, Winslow, ME 04901
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 8 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project area encompasses approximately 1,800 linear feet of riverfront shoreline along the confluence of the Kennebec and Sebasticook Rivers. The site is a National and State Historic Site, with ongoing erosion threatening public infrastructure and historic resources. The selected consultant will conduct project management, data collection, surveying, geotechnical investigation, hydraulic and erosion analysis, alternatives evaluation, preliminary engineering design (30% level), cost estimating, permitting and regulatory review, and final reporting. The Town reserves the right to negotiate scope and fees. The consultant must maintain minimum insurance coverage: Commercial General Liability ($1,000,000 per occurrence / $2,000,000 aggregate), Automobile Liability ($1,000,000 combined single limit), Workers’ Compensation (statutory limits), and Professional Liability ($1,000,000 per claim). Certificates of insurance must be provided prior to contract execution. The project is expected to support climate resilience and adaptation objectives consistent with CRP goals and Maine’s climate action plan.
Key dates
- Questions due
- Dec 15, 2026, 11:59 PM Eastern Time
- Bids due
- Jan 1, 2027
Documents
- RFP_-_Addendum_1_of_1_-_Ft_Halifax_Scoping_Design_Study.pdf3 pages
- RFP_-_Addendum_2_of_2_-_Ft_Halifax_Scoping_Design_Study.pdf2 pages
Similar open bids
- Build Elevator Tower for Building 25 – A/E Design Services (SF330 Request for Qualifications) — VETERANS AFFAIRS, DEPARTMENT OF
- Prequalification for Bridge & Structural Preventative Maintenance — Maine DOT
- Professional Consulting Services for Tax Increment Financing (TIF) District Planning, Design, and Economic Development… — Town of South Berwick
- RFPs Requested – Willett Road Engineering Study — Town of Bridgton
- Downtown Gateway/Main Street Complete Streets & Multimodal Corridor Design — City of Saco
Closing this week nearby
- Route 302 and East Bridge Street Signalization Improvements — closes Nov 19, 2026
- Virtual Veteran Town Hall — Boston VA Medical Center — closes Nov 19, 2026
- UM Mahaney Diamond Field Improvements — closes Nov 19, 2026
- Utility Dump Truck/Snow Plow for City of Brewer — closes Nov 19, 2026
- New 1-Ton, 2-Cubic-Yard, 4X4 Regular Cab Diesel Dump Truck with Snow Plow Attachment — closes Nov 19, 2026