Troy Pike Master Meter Replacement
South Woodford Water DistrictVersailles, Kentucky#26-606
The South Woodford Water District in Versailles, KY, is soliciting bids for the replacement of the master meter at the Troy Pike water system. The work is to be performed by a general contractor. The project is managed by HMB Professional Engineers Inc. (Frankfort). All documents are available through the Lynn Imaging Online Planroom.
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Nov 17, 2026
- Submission
- online portal
Steps to Bid
- 1
Register and sign in to the Lynn Imaging Online Planroom to access the full bid package, including plans and specifications.
- 2
Prepare and submit a complete bid response by 11/17/2026 at 10:00 AM ET.
What you'll need
Submission
Online portal
Get alerts for bids like this
New construction bids in Kentucky
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
All project documents, including plans and specifications, are available through the Lynn Imaging Online Planroom, requiring a login. The solicitation is posted via the Lynn Imaging Online Planroom (Louisville, KY).
Similar open bids
- Camp Nelson National Cemetery, KY - Correct FCA Deficiencies — VETERANS AFFAIRS, DEPARTMENT OF
- Stratton Building Air Traffic Control Suite Interior Renovation — Eastern Kentucky University
- Homeless Shelter and Services Campus — Lexington-Fayette Urban County Government
- CNC Cylinder Boring Machine — Kentucky Community and Technical College System
- The Mission and Installation Contracting Command (MICC), Fort Campbell, KY, is issuing this Special Notice to identify… — DEPT OF THE ARMY
Closing this week nearby
- Kosair Charities Pediatrics First Floor Renovation — closes Nov 20, 2026
- Filter RFP for Pulaski County School System — closes Nov 20, 2026
- CITY OF PIKEVILLE Telecommunications Provider Franchise — closes Nov 23, 2026
- Telecommunications Franchise — closes Nov 23, 2026
- Mountain Parkway Extension to Prestonsburg – Electrical Conduit and Site Work — closes Nov 23, 2026