OpenIFBCloses Jan 7, 2027

Pumping and Transport of Wastewater/Sewage for Toolik Field Station

University of AlaskaNorth Slope, Alaska#UA RFP 27P0040AB

The University of Alaska Fairbanks is seeking qualified contractors to provide wastewater and sewage pumping and transport services for Toolik Field Station in North Slope Borough, Alaska. Work includes pumping from holding tanks and transporting to a treatment facility in Prudhoe Bay. Services must be available year-round under Arctic conditions, with a 48-hour response time. Contractors must provide qualified personnel, vacuum tanker trucks, backup equipment, and comply with safety, transportation, and environmental regulations.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 7, 2027
Time stated in bid documents
Jan 7, 2027, 5:00 PM Alaska Time
Submission
electronic portal

Steps to Bid

  1. 1

    Register with the University of Alaska procurement portal (BonfireHub) if not already registered.

  2. 2

    Review the solicitation document (UA 27P0040AB RFP Pumping & Transport of Wastewater.pdf) and all attachments.

  3. 3

    Submit questions by December 9, 2026, at 5:00 PM AKT. by Dec 9, 2026, 5:00 PM

  4. 4

    Prepare and submit a complete proposal by January 7, 2027, at 5:00 PM AKT. by Jan 7, 2027, 5:00 PM

What you'll need

Submission

Electronic portal

How to submit

Submit proposal via the BonfireHub portal at Official linkPro. No hard copies required.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The University of Alaska Fairbanks (UAF) is soliciting proposals from qualified contractors to provide wastewater and sewage pumping and transportation services for Toolik Field Station, located at Mile 284.5, Dalton Highway, North Slope Borough, Alaska. Services include pumping wastewater from designated holding tanks and transporting it to an approved treatment facility in Prudhoe Bay for proper disposal. The contractor shall provide qualified personnel, appropriate vacuum tanker trucks, backup equipment, and all necessary resources to ensure reliable year-round service under extreme Arctic conditions. Services will be performed on an as-needed basis, with a required response time of 48 hours. All work must comply with applicable safety, transportation, and environmental requirements.

Key dates

Questions due
Dec 9, 2026, 5:00 PM Alaska Time
Bids due
Jan 7, 2027

More from this agency

Closing soon near North Slope Borough