US 92/SR 687 - Resurfacing - Pinellas (E7U75)
Florida Department of Transportation — FDOTClearwater, Pinellas, Florida#E7U75
Traffic control includes temporary barriers, channelizing devices, arrow boards, and temporary signals. Signalization upgrades include new and relocated traffic signals, pedestrian signals, loop detectors, and solar-powered flashing beacons. Work also includes litter removal, mowing, and detours. The contract term is 250 days with a 10-day execution window. The estimated value is $5,196,280.00.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 9, 2026
- Time stated in bid documents
- Dec 9, 2026, 11:59 PM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 250 contract days
- Documents analyzed
- 1
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Installation of Superpave asphaltic concrete (4,638.4 tons)
- Pavement markings using painted and thermoplastic materials
Steps to Bid
- 1
Review the full solicitation document
Download and review the complete bid package, including specifications, drawings, and the full itemized quantity list, available at [link available with Pro].
- 2
Submit questions by the deadline
Bidders may submit questions via email to the designated contact. The deadline for questions is 12:00 PM (noon) on December 2, 2026. Questions must be submitted to the FDOT District 7 office.
- 3
Attend the pre-bid meeting (optional but encouraged)
A pre-bid meeting is scheduled for November 29, 2026, at 10:00 AM at the FDOT District 7 Office, 1000 1st Street, Clearwater, FL 33755. Attendance is encouraged but not mandatory.
- 4
Submit via mail or hand delivery
Bids must be delivered by mail or hand delivery to the FDOT District 7 Office, 1000 1st Street, Clearwater, FL 33755. Electronic submission is not accepted.
What you'll need
Contract duration
250 contract days
Submission
Mail, Hand delivery
NAICS
237130, 237199, 237990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Scope includes removal of existing asphalt pavement (totaling 58,853 square yards), installation of Superpave asphaltic concrete (4,638.4 tons), and friction course (5,015.4 tons). Concrete curbs and gutters (Type F and D), sidewalks, and detectable warnings are included. Pavement markings include painted (standard and thermoplastic) and retroreflective signage. Signalization upgrades involve new and relocated vehicular traffic signals (3- and 4-section aluminum poles), pedestrian signals, loop detectors, and solar-powered rapid flashing beacons at midblock crosswalks. The total roadway length is 3.071 miles.
Key dates
- Pre-bid meeting
- Nov 29, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 9, 2026
Documents
- E7U75.pdf5 pages
More from this agency
- Performance Aesthetics Vegetation Management - Hernando (E7V05-R0) · closes Dec 9, 2026
- US 98/US 301/SR 35/SR 700 - Resurfacing - Pasco County (E7U89) · closes Dec 9, 2026
- US 92/SR 600 Resurfacing and Infrastructure Improvements - Hillsborough County (E7U76) · closes Dec 9, 2026
- Signalization Repair - Districtwide (E3Z70) · closes Dec 10, 2026
- Resurfacing of State Road 742 (Burgess Road) – Escambia County, Florida · closes Dec 10, 2026
Similar bids near Clearwater
- SR 600 (US 92) - Traffic Operations Improvement at Intersection with Steinbrenner Drive, Hillsborough County · Tampa · closes Dec 9, 2026
Closing soon near Clearwater
- Fleet Maintenance Facility Spray Foam Insulation Replacement · Clearwater · closes Dec 2, 2026
- Rapid Gate Services for USCG Air Station Clearwater · Clearwater · closes Dec 2, 2026
- Cylinder Rental Services for USCG Air Station Clearwater · Clearwater · closes Dec 3, 2026
- Deferred Compensation Plan Recordkeeping and Administration Services · Clearwater · closes Dec 3, 2026
- Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid) · Clearwater · closes Dec 4, 2026