OpenRFPCloses Dec 15, 2026, 4:00 PM CT

U.S. Bank Stadium Video Production Systems Project

Minnesota Sports Facilities AuthorityMinneapolis, Hennepin, Minnesota

The Minnesota Sports Facilities Authority is seeking qualified vendors to design, install, and integrate a full video production system at U.S. Bank Stadium in Minneapolis. The project includes high-resolution video capture, real-time graphics and replay, audio integration, control room infrastructure, and networked distribution.

On PublicBidSearch: the original bid posting and 1 bid document for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 15, 2026, 4:00 PM CT
Time stated in bid documents
Dec 15, 2026, 4:00 PM Central Time

Scope of work

  • Deploy networked video distribution to all display systems
  • Support live event production and post-event archival

Steps to Bid

  1. 1

    Review the Request for Proposals (RFP) document dated November 17, 2026, available at Official linkPro

  2. 2

    Submit a complete proposal by December 15, 2026, at 4:00 PM Central Time by Dec 15, 2026, 4:00 PM

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Minnesota Sports Facilities Authority (MSFA) is soliciting proposals for the design, installation, integration, and commissioning of a comprehensive video production system at U.S. Bank Stadium in Minneapolis, MN. The system must support live event production, pre-recorded content, and post-event archival.

Key dates

Bids due
Dec 15, 2026, 4:00 PM CT

Documents

  • RFP_Video_Production_Systems_11.17.2026_final.pdf

See all documents · Download with Pro

More from this agency

Similar bids near Minneapolis

Closing soon near Minneapolis