USD 365 Roofing Solicitation of Bids
Garnett USD 365Garnett, Kansas#USD365-2026-2027
The scope includes removal of existing roofing, roof deck preparation, installation of a specified roofing system with all components and accessories, debris disposal, and final cleanup. Questions must be submitted in writing by December 10, 2026. Required submittals include a completed and signed bid form, itemized pricing, compliance confirmation with specifications, proposed schedule, references, insurance documentation, bid security, and acknowledgment of all addenda.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Bid bond
- 10%
- Submission
- mail, email
- Documents analyzed
- 1
- Required submission items
- 11 items · full checklist with Pro
Scope of work
- Remove and dispose of existing roofing materials
- Inspect and prepare roof deck and substrate
- Install flashing, edge details, transitions, penetrations, and drainage components
- Protect building, grounds, and occupied areas during construction
- Remove and dispose of construction debris
Steps to Bid
- 1
Review the full solicitation and attachments, including Attachment A – Roofing System Specifications and Attachment B – Bid Form.
- 2
Prepare and submit a complete bid package by December 17, 2026, at 11:59 PM, including all required documents. by Dec 17, 2026, 11:59 PM
What you'll need
Contract duration
The contractor shall coordinate all work schedules with the district's designated representative to minimize disruption to school operations, staff, students, and other building activities. No work shall begin until the district has provided written authorization to proceed.
Submission
Mail, Email
NAICS
236220, 236221
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 11-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Work must include protection of the building, grounds, equipment, and occupied areas during construction; removal and proper disposal of construction debris; final inspection, cleanup, and correction of deficiencies; and submission of all manufacturer warranties, contractor warranties, maintenance information, and closeout documentation. The selected contractor must provide a complete, functional, watertight roofing system meeting the attached specifications and manufacturer installation requirements. Bidders must submit a proposed project schedule, confirm compliance with Attachment A – Roofing System Specifications, identify any proposed substitutions or deviations, and include contractor qualifications, references, insurance documentation, and bid security.
Documents
- usd_365_roofing_solicitation_of_bids.pdf7 pages
More from this agency
Closing soon near Garnett
- I-35 and Santa Fe Street Fiber Optic Interconnect · Olathe · closes Dec 1, 2026
- RFB-2026-0013 - 2026-B4 Bridge Polymer Overlay · Lawrence · closes Dec 1, 2026
- RFB-2026-0014 - 2027-06 Mill & Overlay · Lawrence · closes Dec 1, 2026
- Licensed Well Drilling Services for KGS · Lawrence · closes Dec 1, 2026
- Gunn Park Shelter Houses #5 & #7 Exterior Siding Replacement · Fort Scott · closes Dec 3, 2026