ClosedSuppliesClosed Nov 23, 2026

Ball Valve, 4 Inch, Composite, Fresh Water and Seawater Service Only

Department of Defense — Defense Logistics AgencyNationwide (Federal)#SPE7MC-27-T-2035

The Department of Defense is soliciting quotes for one 4-inch composite ball valve (NSN 4820-01-641-6160) for fresh water or seawater service only. First Article Testing (FAT) is required: one unit must be tested and the report submitted within 60 days of contract award. The contractor must notify the Contracting Officer and QAR at least 14 days before shipment. Delivery is FOB Destination. Offerors must disclose if non-domestic materials are used. Safety Data Sheets must be submitted for any hazardous materials. All quotes must be submitted via the DIBBS system. Micro-purchase awards may be made before the closing date.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 23, 2026
Submission
electronic portal
Documents analyzed
1

Steps to Bid

  1. 1

    Register on DIBBS and ensure SAM registration is current.

  2. 2

    Review the full solicitation, including the DLA Master Solicitation and technical requirements.

  3. 3

    Submit a quote via the DIBBS system at Official linkPro before the due date. was Nov 23, 2026, 4:59 AM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    If not willing to quote, submit a 'No Bid' quote in DIBBS with an anticipated quote date.

What you'll need

Submission

Electronic portal

NAICS

336310

Get alerts for bids like this

New supplies and parts bids

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Valve intended for fresh water or seawater service only; not for potable water or steam plant service. Item must comply with technical and quality requirements as defined in the DLA Master List of Technical and Quality Requirements (R/I numbers). First Article Test (FAT) required: contractor must test one unit per FAR 52.209-3, submit report within 60 calendar days of contract award, and provide written notice to the Contracting Officer and Quality Assurance Representative (QAR) at least 14 calendar days prior to shipment. Acceptance and inspection at origin. Packaging per MIL-STD-2073-1E. No mercury or mercury compounds permitted in preservation, packaging, packing, or marking (IP056). WAWF payment system required for invoicing. No additive manufacturing (AM) items allowed.

Documents

  • SPE7MC27T2035.PDF22 pages

See all documents · Download with Pro

More from this agency

Similar bids nearby

Closing soon nearby