Valve Firing Assembly Repair and Refurbishment
Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORT MECHPennsylvania#N0010426QFG31
CONTACT INFORMATION|4|N743.49|WVE|771-229-0573|[email available with Pro]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |[email available with Pro] [email available with Pro]| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This amendment is issued to extend the closing date. \ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 218 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 5. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's [link available with Pro] website. After requesting access, send an email to the Primary POC listed on the solicitation. 7. This is a Level 1 Repair. 8. Please submit: FIRM FIXED PRICE (FFP). This includes the teardown, evaluation, inspection and full repair of the item to "like new" or "A" condition. See statement of work in solicitation. Please also provide an approximate cost of new item if available. 9. A beyond repair (BR)/ beyond economic repair (BER) price shall also beprovided in addition to the repair price at time submission of quote. 10. Do NOT include the cost for shipping material as the government implementedshipping system or ATAC will be shipping/delivering material. 11. This contract utilizes Commercial Asset Visibility (CAV). See clause NAVSUPWSSFA25 for further details. 12. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://[link available with Pro]. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DRAWING DATA=2882675 |10001| F| |D|0001 | C|49998|0186496 DRAWING DATA=2882676 |10001| E| |D|0001 | E|49998|0244350 DRAWING DATA=2882678 |10001| E| |D|0001 | |49998|0277141 DRAWING DATA=2882683 |10001| C| |D|0001 | C|49998|0249376 DRAWING DATA=2995477 |10001| B| |D|0001 | B|49998|0095682 DRAWING DATA=2996431 |10001| C| |D|0001 | C|49998|0053371 DRAWING DATA=2996473 |10001| B| |D|0001 | B|49998|0100674 DRAWING DATA=3013150 |10001| A| |D|0001 | |49998|1232632 DRAWING DATA=3016873 |10001| -| |D|0001 | -|49998|0050021 DRAWING DATA=3016874 |10001| -| |D|0001 | -|49998|0132793 DRAWING DATA=3016889 |10001| -| |D|0001 | -|49998|0047895 DRAWING DATA=3016890 |10001| -| |D|0001 | -|49998|0162280 DRAWING DATA=3017049 |10001| -| |D|0001 | -|49998|0074532 DRAWING DATA=3017050 |10001| A| |D|0001 | |49998|0794211 DRAWING DATA=3017051 |10001| -| |D|0001 | -|49998|0078336 DRAWING DATA=3017052 |10001| -| |D|0001 | -|49998|0063902 DRAWING DATA=3017057 |10001| -| |D|0001 | -|49998|0050830 DRAWING DATA=3017058 |10001| -| |D|0001 | -|49998|0076260 DRAWING DATA=3017114 |10001| A| |D|0001 | |49998|1350437 DRAWING DATA=3017226 |10001| -| |D|0001 | -|49998|0050592 DRAWING DATA=3017309 |10001| -| |D|0001 | -|49998|0083610 DRAWING DATA=3017312 |10001| -| |D|0001 | -|49998|0125869 DRAWING DATA=3017313 |10001| -| |D|0001 | -|49998|0070959 DRAWING DATA=3017326 |10001| -| |D|0001 | -|49998|0092346 DRAWING DATA=629687 |10001| C|LD |D|0001 | C|49998|0046902 DRAWING DATA=629687 |10001| C|LD |D|0002 | B|49998|0034518 DRAWING DATA=629687 |10001| C|LD |D|0003 | C|49998|0036273 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=ASTM-B369 | | | |200401|A| | | DOCUMENT REF DATA=ASTM-A574 | | | |211201|A| | | DOCUMENT REF DATA=ASTM-B584 | | | |110401|A| | | DOCUMENT REF DATA=ASTM-F606 | | | |191115|A| | | DOCUMENT REF DATA=ASTM-A744 | | |A |201101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ASTM-D5363 | | | |160401|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-18240 | | |F |000313|A| 1| | DOCUMENT REF DATA=QPL 18240 | | |QPD|201208|A| | | DOCUMENT REF DATA=MIL-C-24707 | | | |890127|A| |01| DOCUMENT REF DATA=MIL-C-24707 |0003| | |890127|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markings to each unit throughout refurbishment. 3.1.2 IDENTIFYING MARKINGS - Part must have a MIC (Material Identification a and Control) code, heat/heat lot code, or unique Contractor traceability number/code that is visible on the part. See Material Traceability in paragraph 3 (Quality Assurance Provisions) of this contract for traceability requirements. The MIC code can consist of a 2, 3, or 4 letter material identifier, 4 or 5 digit Julian date, 3 digit lot serial number, and Certifyi
On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 11, 2026
Key dates
- Bids due
- Dec 11, 2026
More from this agency
- VALVE,GLOBE · closes Dec 11, 2026
- Washer, QQ-N-286, Special Emphasis (Level I, Scope of Certification) · closes Dec 11, 2026
- Purchase of Valve Bonnet (NAVSHIPS Drawing 803-2177934, Part 85) for Shipboard Systems · closes Dec 11, 2026
- Furnishing of Waveguide Switch, NIIN: 014608648, PN: 677-E-28VDC-P, Quantity: 1 EA · closes Dec 11, 2026
- 47--1.5'' Basket Strainer (NSN 1H-4730-017388283) · closes Dec 11, 2026
More open bids in Pennsylvania
- Fuels Tank Wagon Delivery ITQ · closes Dec 31, 2031
- 59--CHASSIS,ELECTRICAL-, IN REPAIR/MODIFICATION OF · closes Dec 10, 2026
- Repair of Valve, Regulating, SY · closes Dec 2, 2026
- Adhesive, High Strength D4, Storage · closes Nov 24, 2026
- Chassis, VME, 12 SL · closes Nov 30, 2026
Closing soon in Pennsylvania
- Procurement of Industrial Fluid Cooler, NSN 4420016577825, Quantity 8 Units · closes Nov 23, 2026
- Condensate Discharge Valve, NSN 4440014111120, Quantity 18 · closes Nov 23, 2026
- Purchase of 33 Indicating Light Panels, NSN 6220015864043 · closes Nov 23, 2026
- Valve Assembly Procurement · closes Nov 27, 2026
- Pension Admin System Modernization Data Assessment · closes Nov 30, 2026