Valve, Internal Water 24V LwFlr TK A/C Systems - RFQ #705103
Bi-State Development (Metro St. Louis)St. Louis, Missouri#705103
Bi-State Development (Metro St. Louis) is soliciting bids for OEM-only internal water 24V low-floor tank A/C system valves. The solicitation is restricted to original equipment manufacturer items that fully comply with Bi-State’s technical specifications. The solicitation is active and open to qualified vendors.
On PublicBidSearch: the original bid posting and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Nov 18, 2026, 1:50 PM CT
- Submission
- electronic portal
Steps to Bid
- 1
Register on the Bi-State supplier portal at Official linkPro
- 2
Review the RFQ and technical specifications available on the portal
- 3
Submit a bid through the online portal by 13:50 CT on November 18, 2026
What you'll need
Submission
Electronic portal
Get alerts for bids like this
New transportation bids in Missouri
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeMore from this agency
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- On-Call Direct Hire Mechanic Recruitment Services for Bi-State Development (Metro St. Louis) — closes Nov 19, 2026
- Guide Assy., Lower Pivot LH L/Flr Exit Door, Mud Flap Retainer - RFQ #705113 — closes Nov 19, 2026
- Label Unit Return (Bright Orange) — Part 0672166 — closes Nov 20, 2026
- Safety Walk, Ramp (Yellow) LU18-02 — Part 0761082 — closes Nov 20, 2026
Similar open bids
- Golf Course Tractor FY27 — City of Lebanon
- Resurface Route MM and Bus 136 in Scotland County, Missouri — Missouri Department of Transportation
- Airport Refueler Truck FY27 — City of Lebanon
- Public Works Fleet Bid FY27 — City of Lebanon
- Coldmill and Resurface on 44 Spur and Bus Loop 44 in St. Robert, and Route 17 in Waynesville — Missouri Department of Transportation
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026