OpenRFPCloses Dec 31, 2026, 3:00 PM CT

Vane Pump Assembly

Defense Logistics Agency — DLA AVIATION AT OKLAHOMA CITY, OKOklahoma#SPRTA1-26-Q-0404

The purpose of this Amendment is to update the solicitation terms, provisions, and clauses to incorporate mandatory requirements.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 31, 2026, 3:00 PM CT
Time stated in bid documents
Dec 31, 2026, 3:00 PM Central Time
Submission
mail, hand delivery, electronic portal
Documents analyzed
2
Required submission items
2 items · full checklist with Pro

Scope of work

  • New manufacture of Vane Pump Assembly.
  • Assembly composed of aluminum, fiber, and steel.
  • Used on KC-135R Multi-Point Refueling System (MPRS) aircraft.
  • Requires OEM permission to provide to the U.S. Government.
  • Includes a surge option with a Production Surge Plan requirement.

Steps to Bid

What you'll need

Submission

Mail, Hand delivery, Electronic portal

NAICS

336413

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

This solicitation is for the new manufacture of a Vane Pump Assembly, a fuel pump connected to a gearbox and hose drum drive unit used on the KC-135R Multi-Point Refueling System (MPRS) aircraft. The vendor must obtain permission from the Original Equipment Manufacturer (OEM) to provide the item to the U.S. Government, and quotes without this evidence will be considered non-responsive. The solicitation includes a surge option IAW DFARS 252.217-7001, requiring the successful offeror to submit a Capabilities Analysis Plan (CAP) and Production Surge Plan within 30 days after Contracting Officer notification. Pricing for the surge option will be negotiated if exercised. The solicitation is amended to incorporate mandatory requirements from the Revolutionary FAR Overhaul (RFO) Part 40 and DFARS Part 240 (Class Deviation 2026-O0025), including new clauses related to security prohibitions, safeguarding of contractor information systems, and NIST SP 800-171 assessment requirements. The solicitation response date has been extended to December 31, 2026, at 3:00 PM Central Standard Time.

Key dates

Bids due
Dec 31, 2026, 3:00 PM CT

Documents

  • SPRTA126Q0404-0001.pdf17 pages
  • SPRTA126Q0404.pdf44 pages

See all documents · Download with Pro

More from this agency

Similar bids in Oklahoma

Closing soon in Oklahoma