Various Phase I/II Projects, Various Routes, Various Counties, Region Two/District Three

Illinois Department of Transportation — IDOT Bureau of Design and Environment - Consultant ServicesIllinois#P-93-021-27

This solicitation is for Phase I/II engineering services for various projects throughout District Three. Services may include route surveys, land surveys, hydraulic analysis, geometric studies, lighting design, environmental studies, safety studies, and project reports. The estimated engineering fee is $3,000,000, with a contract completion of 60 months after authorization to proceed.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidEmail — included with ProPro

Overview

Due
Nov 19, 2026, 12:00 PM CT
Time stated in bid documents
Nov 19, 2026, 12:00 PM Central Time
Submission
electronic portal
Contract term
60 months
Documents analyzed
1

Scope of work

  • Phase II engineering services for final plans and specifications.
  • Work may include data collection, alignment alternatives, cost estimates, traffic management analysis, crash analysis, bridge condition reports, and TS&L drawin
  • Environmental work limited to site visits for impact identification.
  • Projects may include pavement replacement, patching, resurfacing, bridge repair, rehabilitation, replacement, widening.

Steps to Bid

What you'll need

Contract duration

60 months after authorization to proceed

Submission

Electronic portal

Get alerts for bids like this

New engineering bids in Illinois

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

This work may include data collection, development of alignment alternatives, cost estimates, traffic management analysis, crash analysis, bridge condition reports, TS&L drawings, and other related work and exhibits necessary to complete the Phase I preliminary engineering. Phase II work, if required, may consist of, data collection, conducting route surveys land surveys, hydraulic analysis, geometric studies, lighting plans, structure plans, roadway plans, and any other related work to complete final plans and specifications, as necessary. The Consultant staff should further be knowledgeable in ADA/PROWAG requirements. Environmental work is anticipated to be limited to site visits to identify or confirm impacts and identification of excavation areas, depths, and quantities for regulated substance disposal. The department will furnish the Consultant with any relevant available information such as as-built plans, field notes, traffic data, crash data, agency coordination, right-of-way data, aerial photos, boring logs, and other information. The Consultant may be required to provide a staff member to serve as an IDOT Project Manager or Squad Leader. The Consultant may be required to assist the District in reviewing projects or permits and overseeing other consultants. The Consultant may be expected to perform work in the district office. The selected Consultant and/or their Subconsultants on this project are prohibited from managing contracts where either party is the Prime Consultant or a Subconsultant. The selected firm and/or their Subconsultants may not manage another firm if the relationship was reversed during another phase of work. Projects or tasks requiring CADD are anticipated to be completed using 3D modeling utilizing the Bentley CONNECT OpenX platform of software products and our current CADD environment in accordance with the latest IDOT Computer Aided Design, Drafting, Modeling and Deliverables (CADD) Manual. Work orders under the blanket agreement will be negotiated and authorized by the department on an as-needed basis.

Documents