Vehicle Stabilization and Rescue Lifting Strut Equipment
Town of WiltonMaine#WFD-2026-STRUT-01
Equipment must meet or exceed performance standards of the referenced products. Bidders must submit a sealed envelope with completed bid form, itemized pricing, product specs, manufacturer literature, load ratings, warranty details, delivery schedule, training proposal, safety sheets, references from similar agencies, and equivalency proof for alternatives. Emailed bids not accepted. The bid opening is scheduled for November 19, 2026, at 0800 HRS. Questions may be directed to Sonny Dunham, Fire Chief ([email protected]), or Maria Greeley, Town Manager ([email protected]).
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 8, 2026
- Time stated in bid documents
- Dec 8, 2026, 4:00 PM Eastern Time
- Submission
- mail, hand delivery
- Required submission items
- 11 items · full checklist with Pro
Scope of work
- 1 Paratech VSK 22-796852 or approved equal
- 2 Hydra Fusion Auto Shore 10 Kits or approved equal
- 2 Hinged Base 6 with Anchor Ring or approved equal
- 2 Multi Chain Base or approved equal
- 2 Swivel Base 6 or approved equal
- 2 Rigid Base 6 or approved equal
Steps to Bid
- 1
Register or pre-qualify if required (not stated)
- 2
Submit questions by the deadline (not stated in document)
- 3
Attend pre-bid meeting if required (not stated)
- 4
Prepare sealed bid package including completed bid form, itemized pricing, product specifications, manufacturer literature, load rating documentation, warranty information, delivery schedule, training proposal, safety specification sheets, references from similar fire, EMS, or rescue agencies, and a
What you'll need
Submission
Mail, Hand delivery
NAICS
339999
How to submit
Bids must be submitted in a sealed envelope clearly marked '2026 Vehicle Stabilization and Rescue Strut Equipment Bid'. Emailed bids will not be accepted. Late submissions will not be considered.
In person/mail: Town of Wilton, 158 Weld Road, Wilton, ME 04294
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 11-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The system must meet or exceed the capabilities, safety standards, durability, and operational performance of the Para Tech Highway Vehicle Stabilization Kit (VSK), Hydra Fusion Auto Shore System, and associated components. The scope includes stabilization and lifting for passenger vehicles, pickup trucks, commercial vehicles, school buses, agricultural equipment, construction equipment, heavy trucks, vehicle rescue incidents, and collapse rescue incidents. Rescue struts must meet or exceed Paratech VSK load capacities, support compression and tension loading, allow angled stabilization, feature corrosion-resistant construction, positive locking mechanisms, and permanently marked load ratings. Hydraulic systems must include struts, pumps, hoses, couplers, valves, and storage; include positive mechanical locks, overload protection, and pressure relief. Base plates must be compatible with rescue struts, allow multiple angles, provide anti-slip features, function on asphalt, concrete, gravel, soil, and snow, and meet or exceed manufacturer load ratings. All hardware, including rescue-rated chains, grab hooks, clevises, shackles, and tensioning devices, must meet or exceed load ratings. Vendors must provide initial operational training, equipment familiarization, inspection and maintenance procedures, and technical support. A training outline must be included. Warranty must be provided on rescue struts, hydraulic components, and structural components, with manufacturers’ standard or better coverage. Alternate products may be proposed only if documentation proves equal or superior performance in safety, load capacities, durability, construction quality, serviceability, operational performance, and warranty support. Late submissions will not be considered. Required contents: completed bid form, itemized pricing, product specifications, manufacturer literature, load rating documentation, warranty information, delivery schedule, training proposal, safety specification sheets, references from similar fire, EMS, or rescue agencies, statement of compliance (if applicable), and equivalency documentation for alternate products. Incomplete submissions may be considered non-responsive. The Fire Department will review bids and recommend to the Selectboard on Tuesday, December 15, 2026.
Key dates
- Bids due
- Dec 8, 2026
Documents
- www.wiltonmaine.gov
Similar bids near Wilton
- Public Level 2 Electric Vehicle (EV) Chargers · Augusta · closes Dec 3, 2026
Closing soon near Wilton
- 2026 RFP for Hose and Nozzles · Waterville · closes Dec 1, 2026
- One (1) Surveillance Trailer for the Police Department · Lewiston · closes Dec 1, 2026
- Medical/Mental Health Services RFP · South Paris · closes Dec 2, 2026
- Commencement Photographer Services · Fairfield · closes Dec 3, 2026
- Five-Year Master Lease Purchase Agreement for Two 2028 Blue Bird Vision Type C Propane School Buses · Oakland · closes Dec 4, 2026