OpenRFPCloses Dec 17, 2026

Wardlow Road Sewer Improvements Project (SC-0540) Engineering Design Services

Long Beach Utilities DepartmentLong Beach, Los Angeles, California#UD-27-372

The work includes full engineering design, permitting, and construction support for sewer infrastructure upgrades. A pre-proposal conference is strongly encouraged and will be held online on December 3, 2026. The contract term is anticipated to run from January 1, 2027, to July 1, 2028.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 2:00 PM Pacific Time
Submission
electronic
Contract term
January 1, 2027, through July 1, 2028

Scope of work

  • Design sewer improvements along Wardlow Road
  • Coordinate with utility providers and environmental agencies
  • Prepare preliminary and final engineering designs
  • Obtain required permits and approvals
  • Support construction phase with technical assistance

Steps to Bid

  1. 1

    Register with Long Beach Buys portal (if not already registered)

  2. 2

    Review the attached Request for Proposals (RFP) document for full scope and requirements

  3. 3

    Attend the pre-proposal conference (strongly encouraged) on December 3, 2026, at 2:00 PM PST via MS Teams by Dec 3, 2026, 2:00 PM

  4. 4

    Submit proposal electronically by December 17, 2026, at 2:00 PM PST by Dec 17, 2026, 2:00 PM

What you'll need

Submission

Electronic

NAICS

541330, 541390

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Long Beach Public Utilities Department (LBPUD) is seeking a professional engineering consulting firm (Consultant) to provide engineering design services for the Wardlow Road Sewer Improvements Project (SC-0540). A pre-proposal conference is strongly encouraged and will be held virtually via MS Teams on December 3, 2026, at 2:00 PM PST. The successful firm will be responsible for all design phases, including preliminary and final design, stormwater and environmental coordination, and coordination with utility providers. The contract term is expected to begin January 1, 2027, and continue through July 1, 2028, with potential for extension based on project needs.

Key dates

Pre-bid meeting
Dec 3, 2026, 2:00 PM Pacific Time
Bids due
Dec 17, 2026

Documents

  • SC-0540_Wardlow_Road_Sewer_Improvements_RFP.pdf

See all documents · Download with Pro

More from this agency

Similar bids near Long Beach

Closing soon near Long Beach