Bridge Replacement on County Road 580A at RM 7.30 Over Big Cottonwood Creek, Washakie County, Wyoming
Wyoming DOT — WYDOTWashakie, Wyoming#HI-BFP-CN20072
The Wyoming Department of Transportation is soliciting bids for the replacement of a timber bridge on County Road 580A at RM 7.30 over Big Cottonwood Creek in Washakie County. The scope includes removal of the existing bridge, excavation, placement of road base, installation of 96 linear feet of precast box culverts (16 ft x 12 ft), riprap, reinforcing steel, and structural concrete. Bidders must be prequalified and submit bids electronically via the WYDOT iCX system by 10:00 AM on December 10, 2026. A bid bond of 10% of the total bid amount is required. The project is funded with $1,200,000 in federal funds and is scheduled for completion by October 31, 2027.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 11, 2026
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 3 years + two additional one-year renewal terms
- Documents analyzed
- 3
Scope of work
- Remove one timber bridge
- Excavate 330 CY of unclassified material
- Place 30 CY of pervious backfill material
- Install 223 SY of geotextile erosion control
- Install 821 SY of biaxial geogrid
Steps to Bid
- 1
Register and pre-qualify with WYDOT through the iCX system at least two weeks before the bid deadline.
- 2
Download the bid package, plans, and specifications from the QuestCDN website at Official linkPro.
- 3
Submit all required documents, including the bid form (E-91), bid bond, and certifications, via the WYDOT iCX electronic bidding system.
- 4
Attend the pre-bid meeting (optional but recommended) and make an appointment with the Resident Engineer, Kelly Erickson, P.E., to inspect the site.
- 5
Submit any questions to the WYDOT Contracts & Estimates office by the deadline specified in the invitation.
What you'll need
Prequalification
RequiredSubmission
Electronic portal
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Work includes clearing and grubbing, removal of signs and fencing, unclassified excavation, culvert subexcavation, topsoil storage and placement, storm water control, seeding, geotextile and geogrid installation, crushed base, temporary traffic control, and contractor quality control. The bid opening will be held online via Zoom and in person at WYDOT Headquarters in Cheyenne, Wyoming. The Transportation Commission of Wyoming will consider bids on December 17, 2026.
Key dates
- Bids due
- Dec 11, 2026
- Expected award
- Dec 17, 2026
Documents
- Letting_Schedule_--_Updated_10-06-2026_.pdf37 pages
- CN20072_-_E-79.pdf2 pages
- CN20072_-_schedule.pdf2 pages
More from this agency
- Crack and Seat and Overlay on I-25 SBL from RM 114.69 to RM 120.82, Wheatland to Douglas, Platte County, Wyoming — closes Dec 11, 2026
- Casper - Wyoming Blvd (WYO 258) Mill and Overlay, Natrona County, WY — closes Dec 11, 2026
- Laramie/I-80/Blair Road WBL/AXV and EBL/AXU Bridge Replacement (HI-BFP-I805189 & NHPPI-I805190) — closes Dec 11, 2026
- BURGESS JUNCTION-LOVELL/US 14A - HOT IN-PLACE RECYCLE PAVING (STP-P352038) — closes Dec 11, 2026
- DOUGLAS-GILLETTE/WY 59 - VAULTING REPAIR (NHPP-PM-N431039) — closes Dec 11, 2026
Similar open bids
- Bridge Rehabilitation for Six Structures in District 4, Crook and Weston Counties, Wyoming — Wyoming DOT
- Bridge Replacement on Converse County Road 17 Over Boxelder Creek, Converse County, Wyoming — Wyoming DOT
- Call Order 006 -- STP-BR-B254006 District 4 Bridge Rehab — Wyoming Department of Transportation
- Call Order 008 -- HI-BFP-CN13080 Converse County Rd No. 17 (Bridge Over Boxelder Creek) — Wyoming Department of Transportation
Closing this week nearby
- National Electric Vehicle Infrastructure Program — closes Nov 18, 2026
- Reverse Osmosis System Replacement — closes Nov 18, 2026
- Converse Co School District 2: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) with District… — closes Nov 19, 2026
- Purchase of Two 83- or 84-Passenger School Buses with Full Air Conditioning — closes Nov 19, 2026
- Scrap Metal Collection and Purchasing Services — Fremont County Solid Waste Disposal District — closes Nov 19, 2026