Washington Avenue Lighting System Installation
City of JonesboroJonesboro, Arkansas#2026:25
The City of Jonesboro is seeking a contractor to install a complete lighting system along Washington Avenue, including 28 poles and fixtures, underground conduits, and electrical connections. Work must be completed within 90 days of a purchase order. The contractor must provide all materials and labor except for poles, fixtures, and auger bases, which are supplied by the City. A 5% bid bond is required, and the successful bidder must provide a performance bond.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Sep 16, 2026, 2:00 PM CT
- Time stated in bid documents
- Sep 16, 2026, 2:00 PM Central Time
- Bid bond
- 5%
- Performance bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 90 calendar days from issuance of purchase order
- Documents analyzed
- 4 published · 2 analyzed
- Required submission items
- 5 items · full checklist with Pro
Scope of work
- Mount 28 LED light fixtures with dusk-to-dawn sensors
- Install underground electrical conduits (Schedule 40 below-grade, Schedule 80 above-grade)
- Install 28 pull boxes and service points
- Backfill and seed all trenches and disturbed ground
- Coordinate with City Water & Light for meter and service point locations
Steps to Bid
What you'll need
Insurance
RequiredGeneral liability and workers’ compensation insurance required. Proof of coverage must be provided by successful bidder.
Prequalification
Not requiredContract duration
90 calendar days from issuance of purchase order
Award method
Lowest responsible bidder
Submission
Mail, Hand delivery
NAICS
237130
Get alerts for bids like this
New electrical bids in Arkansas
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Contractor shall provide all labor, materials (except poles, fixtures, and bases supplied by the City), supervision, tools, equipment, freight, and taxes. All electrical work must comply with the latest National Electric Code and be performed under an Arkansas-licensed electrician. The contractor shall obtain all utility locates prior to work and provide One-Call reference numbers. Proof of liability and workers’ compensation insurance required.
Documents
- Invitation to Bid 2026-25_1.pdf7 pages
- Washington Lighting Plans Binder Stamped.pdf16 pages
2 agency-portal links
Closing soon near Jonesboro
- Request for Qualifications — City Attorney Position, City of Paragould, Arkansas · Paragould · closes Dec 1, 2026
- Request for Qualifications: Arkansas– Construction Management Services · Brookland · closes Dec 4, 2026
- RFQ for Construction Manager – Gosnell School District · Gosnell · closes Dec 4, 2026
- Commercial-Grade Luxury Vinyl Plank Flooring Installation at Earle Virtual High School · Earle · closes Dec 4, 2026
- Full-Service Custodial Services for Trumann School District — 2027-2028 School Year · Trumann · closes Dec 4, 2026