OpenRFQCloses Dec 15, 2026

Wastewater Treatment Plant Masterplan Upgrades

City of Lakeland — Water Utilities - EngineeringLakeland, Florida#2026-RFQ-134

The City of Lakeland is seeking a Design-Build firm to upgrade the Glendale and Northside Wastewater Reclamation Facilities using the Progressive Design Build method. Key project goals include installing a new solar drying facility or equivalent that produces consistent Class AA biosolids, replacing the intermediate pump station at the Glendale site, upgrading or replacing system equipment and systems, and increasing plant capacity. The solicitation is governed by Florida Statute 287.055 (CCNA), and no rates are to be included in the proposal.

Open Original Bid Source Pro

Overview

Due
Dec 15, 2026
Time stated in bid documents
Dec 15, 2026, 2:00 PM Eastern Time

Scope of work

  • Increase overall plant capacity at Glendale and Northside facilities
  • Provide preliminary and final design, permitting, bidding, and construction management

Steps to Bid

  1. 1

    Review the RFQ and all associated materials.

  2. 2

    Submit a proposal in response to the RFQ by the due date. by Dec 15, 2026, 2:00 PM

What you'll need

Insurance

Required

In compliance with the Florida Consultants’ Competitive Negotiation Act (CCNA), (Chapter 287), rates shall not be included in this proposal.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The purpose of this RFQ is to select a Design-Build firm that can utilize existing information provided by the City and/or other sources, review current technology, and provide the most cost-efficient design and construction associated with preliminary and final designs, permitting, bidding, and construction management. The key goals of the project are the installation of a new solar drying facility or an equivalent recommended facility that achieves consistent Class AA biosolids, replacement of the existing intermediate pump station located at the Glendale site, replacement or upgrades for equipment and systems as needed in the system, and to seek opportunity to increase plant capacity. The City of Lakeland is currently interested in solar drying based on site visits to other plants but will consider other facilities that achieve consistent Class AA biosolids, with the exception of composting. This solicitation will follow the requirements of Florida Statute 287.055, termed the 'Consultants’ Competitive Negotiations Act (CCNA)'. In compliance with the Florida Consultants’ Competitive Negotiation Act (CCNA), (Chapter 287), rates shall not be included in this proposal.

Key dates

Bids due
Dec 15, 2026

More from this agency

Similar open bids

Closing this week nearby