Water, Sanitary Sewer, & Drainage Facilities and Paving and Appurtenances to Serve Colton Section 13
Colton Municipal Utility District No. 2Texas#1968-40013
Colton Municipal Utility District No. 2 is seeking bids for the construction of water, sanitary sewer, drainage, and paving infrastructure in Colton Section 13, Montgomery County, Texas. Bids must be submitted electronically via [link available with Pro] or delivered in person to LJA, Inc. in Katy, Texas, by 11:00 a.m. Central Time on December 15, 2026. A non-mandatory pre-bid conference is scheduled for December 8, 2026, at 11:00 a.m. Central Time. Each bid must include a bid bond or certified/cashier’s check equal to at least 2% of the total bid amount. Bidders must register and pay $100 non-refundable plus $50 for electronic delivery to access the documents. The Owner may reject any or all bids.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 15, 2026, 11:00 AM CT
- Time stated in bid documents
- Dec 15, 2026, 11:00 AM Central Time
- Bid bond
- 2%
- Submission
- electronic portal
- Documents analyzed
- 1
- Required submission items
- 4 items · full checklist with Pro
Scope of work
- Install water mains and service lines
- Construct sanitary sewer lines and manholes
- Build storm drainage systems and catch basins
- Pave 2.3 miles of roadway with asphalt
- Install curbs, gutters, and sidewalks
- Provide stormwater detention and flow control
Steps to Bid
- 1
Register and obtain bidding documents via Official linkPro for $100 non-refundable plus $50 for electronic delivery.
- 2
Attend the non-mandatory pre-bid conference on December 8, 2026, at 11:00 a.m. Central Time via phone at +1 346-202-6170 (Conference ID: 264 166 758#). by Dec 8, 2026, 11:00 AM
- 3
Submit the bid electronically through Official linkPro by 11:00 a.m. Central Time on December 15, 2026. by Dec 15, 2026, 11:00 AM
- 4
Ensure the bid is accompanied by a bid bond or certified/cashier’s check in an amount not less than 2% of the total bid amount. by Dec 15, 2026, 11:00 AM
What you'll need
Submission
Electronic portal
NAICS
237130, 237199
How to submit
Bids must be submitted electronically through Official linkPro. Bidders must register and obtain bidding documents on this website. All electronic bids and bid securities must be submitted through the portal. Bidders must also deliver the original certified or cashier’s check to the bid opening address within one business day of receiving the bid opening notice.
In person/mail: 1904 West Grand Parkway North, Suite 120, Katy, Texas 77449
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Colton Municipal Utility District No. 2 is soliciting sealed bids for the construction of water, sanitary sewer, drainage facilities, and paving and appurtenances to serve Colton Section 13. The work includes installation of water mains, sanitary sewer lines, storm drainage systems, and asphalt paving with related infrastructure. Bids must be submitted electronically via [link available with Pro] or delivered in person to LJA, Inc., 1904 West Grand Parkway North, Suite 120, Katy, Texas 77449, by 11:00 a.m. Central Time on Tuesday, December 15, 2026. The Owner reserves the right to reject any or all bids and to waive defects in the bidding process, except for the time of submission.
Key dates
- Pre-bid meeting
- Dec 8, 2026, 11:00 AM Central Time
- Bids due
- Dec 15, 2026, 11:00 AM CT
Documents
- 1_1968-40013_Invitation_to_Bidders.pdf2 pages
More from this agency
- Water, Sanitary Sewer, Drainage, Paving, and Appurtenances for Colton Section 13 · closes Dec 15, 2026
Similar bids in Texas
- Construction of Water, Sanitary Sewer, Storm Sewer, Drainage, and Paving Facilities for Autumn Ridge Unit 1, Project… · closes Dec 3, 2026
- Construction of the Wastewater Treatment Plant (0.275 MGD) - Phase 1 for Liberty County Municipal Utility District No.… · closes Dec 15, 2026
- Water, Sanitary Sewer and Drainage Facilities, Paving and Appurtenances and Detention to Serve Allison Pointe · closes Dec 3, 2026
- RFP 2027-001 Hauling of Dewatered Sludge · closes Dec 3, 2026
- Construction Plans for Goodman Ranch – Offsite Utility Improvements Water 6, and Engineering Plans Franklin Branch… · closes Dec 3, 2026
Closing soon in Texas
- 25-Ton HVAC Unit with Installation for Texas Department of Criminal Justice · closes Nov 30, 2026
- Electrical Repairs, Maintenance, and Installation for All Panola County-Owned Buildings — One-Year Contract · closes Dec 1, 2026
- New Public Water System for Colorado Bend State Park · closes Dec 2, 2026
- Aviation Support Equipment Load Testing · closes Dec 3, 2026
- Roofing Repair, Maintenance, and Waterproofing Services for Frisco Independent School District Facilities · closes Dec 4, 2026