OpenConstructionCloses Jan 21, 2027

Water Treatment Plant Nos. 3 and 9 Process Improvements

Palm Beach CountyFlorida#23-023

A 5% bid bond is required. A mandatory 8% SBE subcontracting goal applies; waiver requests must be submitted with the bid. The pre-bid conference is on December 9, 2026, at 10:00 AM in Delray Beach. Bidders must submit on official forms and include a bid bond.

On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 21, 2027
Time stated in bid documents
Jan 21, 2027, 2:30 PM Eastern Time
Bid bond
5%
Performance bond
100%
Submission
hand delivery
Required submission items
3 items · full checklist with Pro

Scope of work

  • Replace degasifiers at WTP 3 and WTP 9
  • Replace odor scrubbers at WTP 3 and WTP 9
  • Replace blowers at WTP 3 and WTP 9
  • Install new clean-in-place systems
  • Restore clearwells at WTP 3 and WTP 9
  • Add additional fuel storage

Steps to Bid

  1. 1

    Download and submit the Plan Holder Registration form to access exempt bid documents.

  2. 2

    Attend the pre-bid conference (optional) on December 9, 2026, at 10:00 AM at WTP 3 Conference Room, 13026 Jog Road, Delray Beach, FL 33446. by Dec 9, 2026, 10:00 AM

What you'll need

Submission

Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

3 and 9 (WTP 3 and WTP 9) by implementing various improvements, including replacement of aging infrastructure. Scope includes: new clean-in-place systems, replacement of degasifiers, replacement of odor scrubbers, replacement of blowers, clearwell restorations, additional fuel storage, an overhead crane system for pump maintenance, miscellaneous electrical/instrumentation improvements, and preparation of a master set of record drawings inclusive of all underground piping at both WTP 3 and WTP 9. Bid documents available for free download at [link available with Pro] beginning November 24, 2026. Bidders must download and submit a Plan Holder Registration form to access exempt bid documents. Partial sets not available. Mailed documents require an express mail account number. Bid documents may also be examined at ConstructConnect, Dodge Data & Analytics, LLC, and Construction Journal, Stuart. Bidders must notify the PBCWUD Project Manager via email to be registered for addenda and updates. A non-mandatory pre-bid conference will be held on December 9, 2026, at 10:00 AM at WTP 3 Conference Room, 13026 Jog Road, Delray Beach, FL 33446. A non-mandatory site visit will follow. Attendance is recommended and encouraged. Bidders unable to meet the goal must submit a waiver request at time of bid submission per Instructions to Bidders Section 5.3.3. Waiver requests not submitted at time of bid will not be considered. A public construction bond (100%) will be required of the successful bidder within 14 calendar days of award notification. The Board of County Commissioners reserves the right to reject any and all bids and waive any irregularities.

Key dates

Pre-bid meeting
Dec 9, 2026, 10:00 AM Eastern Time
Bids due
Jan 21, 2027

More from this agency

Similar bids in Florida

Closing soon in Florida