OpenIFBCloses Dec 1, 2026

West Dartmouth Avenue Multimodal Safety Improvements Project

City of EnglewoodEnglewood, Colorado#ITB-26-039

The City of Englewood is soliciting bids for the West Dartmouth Avenue Multimodal Safety Improvements Project, which includes reconstructing ADA-compliant curb ramps, installing bike lanes, replacing traffic signals at Tejon Street, and upgrading street lighting. Work also includes removal of existing pavement and structures, stormwater and erosion control, electrical installation, and traffic control.

On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Due
Dec 1, 2026
Time stated in bid documents
Dec 1, 2026, 2:00 PM Mountain Time
Submission
mail, hand delivery
Documents analyzed
4 published · 2 analyzed

Scope of work

  • Reconstruct 47 square yards of concrete curb ramps to ADA compliance
  • Install 340 square feet of preformed thermoplastic pavement marking for bike lanes
  • Replace traffic signals at Tejon Street with new equipment
  • Install 4 LED luminaires (12,000 lumens) and 1 35-foot metal light standard
  • Remove 40 linear feet of curb, gutter, and sidewalk and 31 square yards of concrete curb ramp

Steps to Bid

  1. 1

    Register with the City of Englewood procurement system and obtain access to the bid documents.

  2. 2

    Submit any questions to the procurement specialist by 11/17/2026 at 2:00 PM MT. was Nov 17, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Prepare and complete the bid form, including all required qualifications, references, and financial statements.

  4. 4

    Submit the completed bid package via mail or hand delivery to the City of Englewood Procurement Office by 12/1/2026 at 2:00 PM MT. by Dec 1, 2026, 2:00 PM

What you'll need

Contract duration

Not stated

Submission

Mail, Hand delivery

NAICS

237130

How to submit

Submit one original signed bid form, one electronic copy on USB drive, and all required attachments in a sealed envelope. All documents must be received by the deadline.

In person/mail: Procurement, 3rd Floor, 1000 Englewood Parkway, Englewood, CO 80110

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project aims to enhance safety and accessibility for all transportation modes, including bicycling, walking, and bus transit. Scope includes reconstructing curb ramps throughout the corridor to meet ADA standards, modifying pavement markings to implement dedicated bike lanes, replacing traffic signals at Tejon Street, and installing improved street lighting. Additional scope includes stormwater management with silt fences, aggregate bags, pre-fabricated washout structures, and erosion control. Electrical work includes installation of conduit (bored and plastic), pull boxes, wiring, luminaires (LED), light standards (35-foot metal), foundation pads, meter power pedestals, and traffic signal components such as controllers, cabinets, push buttons, and detection systems. Other work includes construction survey, mobilization, public information management (Tier III), traffic control (flagging, uniformed control, inspection, management, barricades, cones, signs), and minor contract revisions. The project will be performed under a fixed-price, lump-sum contract. The City reserves the right to reject any or all bids.

Key dates

Questions due
Nov 17, 2026, 2:00 PM Mountain Time
Bids due
Dec 1, 2026

Documents

  • Bid_Invitation.pdf20 pages
  • Bid_Invitation.pdf20 pages

2 agency-portal links

See all documents · Download with Pro

More from this agency

Similar bids near Englewood

Closing soon near Englewood