OpenConstructionCloses Dec 16, 2026

West Point Treatment Plant Weight Scales Replacement

King CountySeattle, Washington#KC001774

King County is soliciting bids to replace weight scales in both bays at the West Point Treatment Plant, located at 1400 Discovery Park Blvd, Seattle, WA 98199. The project involves installing concrete deck scales and a coating system in two phases. Containment of dewatered biosolids (3.5 cubic yards, 5,000 lbs) is required during non-working hours and weekends. Four spare load cells are required. Work will occur in an active wastewater treatment facility.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 16, 2026
Time stated in bid documents
Dec 16, 2026, 1:30 PM Pacific Time
Submission
electronic portal

Scope of work

  • Provide four spare load cells (two per bay)
  • Clean and maintain load cell pit prior to scale deck installation
  • Perform work within an operating wastewater treatment facility

Steps to Bid

  1. 1

    Submit questions to the contact person by the questions deadline (not specified).

  2. 2

    Submit a complete bid package by the due date and time. by Dec 16, 2026, 1:30 PM

What you'll need

Submission

Electronic portal

How to submit

Submit via the online portal at Official linkPro

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The work to be performed under this contract includes furnishing all tools, equipment, materials, supplies, and manufactured articles; furnishing all labor, transportation, and services, including fuel, power, water, and essential communications; and performing all work or other operations required for the fulfillment of the contract, in strict accordance with the Contract Documents. Provide complete work. Provide all work, materials, and services not expressly indicated in the Contract Documents that may be necessary for the complete and proper construction of the work and administration of the contract. Work will be completed in two phases, one for each bay. Solids containment is required after regular working hours and on weekends in the truck bay under construction to contain dewatered biosolids. Anticipated volume and weight of biosolids are estimated at 3.5 cubic yards and 5,000 lbs, respectively.

Key dates

Bids due
Dec 16, 2026

Documents

  • FileContents

See all documents · Download with Pro

More from this agency

Similar bids near Seattle

Closing soon near Seattle