OpenConstructionCloses Dec 9, 2026, 3:00 PM CT

West Wing Renovation

Richland Community CollegeDecatur, Illinois

Richland Community College is soliciting bids for the renovation of 28,000 square feet in the West Wing of its main campus, including modernized classrooms, a reconfigured Learning Resources Center, updated administrative offices, new exterior access and walkways, and building system upgrades. The project is part of Phase 2 of the Facilities Master Plan. Bids are due by 3:00 PM on December 9, 2026, in the America/Chicago time zone. The renovation is expected to be completed in time for the spring 2028 semester. Plans are available through the BLDD Architects Plan Room.

On PublicBidSearch: the original bid posting and 1 bid document for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 9, 2026, 3:00 PM CT
Time stated in bid documents
Dec 9, 2026, 3:00 PM Central Time

Scope of work

  • Renovate 28,000 sq ft of West Wing space
  • Redesign classrooms with flexible layouts and technology
  • Consolidate and upgrade the Learning Resources Center
  • Install new exterior entrance and walkways to south courtyard
  • Upgrade mechanical, electrical, plumbing, and building systems

Steps to Bid

  1. 1

    Review the project scope and architectural plans available through the BLDD Architects Plan Room.

  2. 2

    Submit a bid response by 3:00 PM on December 9, 2026, in the America/Chicago time zone. by Dec 9, 2026, 3:00 PM

What you'll need

NAICS

236220, 236118

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project will modernize 28,000 square feet of the original main campus facility, constructed in 1987, extending from the Center Core west to the corridor connecting the main campus to the Shilling Community Education Center. Scope includes: redesign of classrooms and instructional spaces with flexible layouts, integrated technology, and collaborative learning areas; consolidation and renovation of the Learning Resources Center (LRC) into a more functional, accessible, and student-centered environment; continued use of DIRTT modular interior systems for reconfigurable spaces; upgrades to faculty, Academic Services, Marketing, and Richland Community College Foundation offices to improve natural light access and collaboration; construction of a new exterior entrance near faculty offices with direct access to the south courtyard, along with additional walkways and patio areas to enhance outdoor gathering and campus accessibility; and improvements to aging mechanical, electrical, plumbing, and other building systems to increase efficiency, comfort, and long-term sustainability. The renovated spaces are expected to be ready for the spring 2028 semester. Construction will be coordinated to minimize disruption to ongoing classes and campus operations. The official bid submission deadline is 3:00 PM on December 9, 2026, in the America/Chicago time zone.

Key dates

Bids due
Dec 9, 2026, 3:00 PM CT

Documents

  • richland-community-college-master-plan-phase-2-west-wing-renovation

See all documents · Download with Pro

Similar bids near Decatur

Closing soon near Decatur