Westside Trail Segment 6 - Construction
Atlanta Beltline, INC.Georgia#DC-2026-130:
Atlanta Beltline, Inc. is seeking qualified contractors to construct Westside Trail Segment 6 from Lawton Street to White St SW in Atlanta, GA. Scope includes trail construction, site improvements, storm drainage, utilities, paving, lighting, fencing, and site furnishings. The solicitation is open to qualified firms with no set-aside stated. The project is funded through Atlanta Beltline, Inc. and is part of the larger Beltline trail network.
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Jan 12, 2027
- Time stated in bid documents
- Jan 12, 2027, 1:00 PM Eastern Time
- Submission
- electronic portal
Scope of work
- Install storm drainage and utilities along the trail alignment
- Pave 1.1 miles of trail with concrete and pavers
- Install lighting, signage, and security cameras
- Construct fencing, railings, and site furniture
- Handle brownfield soil and implement erosion control measures
Steps to Bid
- 1
Review the full solicitation, including all exhibits, addenda, and documents available on Bonfire at Official linkPro. was Nov 10, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit questions by December 10, 2026, at 4:00 PM ET. by Dec 10, 2026, 4:00 PM
- 3
Prepare and submit a sealed bid by January 12, 2027, at 1:00 PM ET. by Jan 12, 2027, 1:00 PM
What you'll need
Submission
Electronic portal
NAICS
237130, 237199
How to submit
Bids must be submitted electronically via the Bonfire portal at Official linkPro. No physical submissions are accepted. Bidders must ensure all required documents are uploaded before the deadline.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
Atlanta Beltline, Inc. (ABI) is soliciting competitive sealed bids from qualified firms to provide construction services for Westside Trail Segment 6, extending from the current end of the Westside Trail at Lawton Street to the intersection with the Westside Trail adjacent to White St SW. Scope includes brownfield soil handling, erosion control, grading, demolition, site retaining and decorative walls, storm drainage, utilities, concrete trail paving, pavers, lighting, security cameras, signage and marking, fencing and railings, site furniture and waste receptacles, and bollards. Construction Drawings, Specifications, and supplemental documents are referenced in exhibits and/or appendices and available for download from Bonfire at [link available with Pro].
Key dates
- Questions due
- Dec 10, 2026, 4:00 PM Eastern Time
- Bids due
- Jan 12, 2027
More from this agency
- Northwest Trail Segment 2C - Construction · closes Dec 8, 2026
- Restoration of Proctor Creek at 425 Chappell · closes Dec 8, 2026
- Professional Consultant Services: Historic and Cultural Resources Implementation Support · closes Dec 16, 2026
- Atlanta Beltline Commercial Affordability Implementation Consultant and Related Services · closes Dec 28, 2026
- Urban Fellows Qualified Consultant Registry · closes Jan 1, 2027
Similar bids in Georgia
- Well No. 12 Rehabilitation · closes Dec 3, 2026
- Construction Manager at Risk (CMAR) Preconstruction and Construction Services for Middle Oconee WRF 2027 Expansion · closes Dec 17, 2026
- Groundwater Well Construction and Associated Buildings for Downrange Industrial Park and Surrounding Areas · closes Dec 17, 2026
- RFB No. 27-0011 Tennis Court Resurfacing at Lakebottom Park and Double Churches Park · closes Dec 9, 2026
- CM at Risk for Sonny Carter Elementary School Renovations · closes Dec 22, 2026
Closing soon in Georgia
- Marquee Sign Replacement - Henry H. Brighman · closes Dec 1, 2026
- RFQ 2026 - 002 Professional Engineering Services · closes Dec 1, 2026
- AGING-RELATED SERVICES FOR THE CSRA (non-nutrition) · closes Dec 1, 2026
- IFB 004-27 Milk and Milk Products · closes Dec 2, 2026
- Annual Contract for Engineering and Environmental Services · closes Dec 3, 2026