WSM-W: Water and Sanitary Sewer Replacement Contract 2023 – Part 1
City of Fort WorthFort Worth, Texas#27-0042
The City of Fort Worth is soliciting bids for the construction of water and sanitary sewer infrastructure on N. Commerce St from NE 5th to NE 4th St. Work includes 615 LF of 12-inch water line, 53 LF of 12-inch ductile iron pipe in 24-inch steel casing, 19 LF of 8-inch DR-14 PVC water line, 938 LF of permanent asphalt paving repair, and 70 SY of block sod replacement. Bidders must be pre-qualified by the City at bid opening for certain work. All bids must be submitted electronically via the Bonfire portal by 2:00 PM CST on January 14, 2027. Bids delivered after that time or in any other format will not be accepted. The City may reject any or all bids.
On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 14, 2027, 2:00 PM CT
- Time stated in bid documents
- Jan 14, 2027, 2:00 PM Central Time
- Submission
- electronic portal
- Required submission items
- 1 items · full checklist with Pro
Steps to Bid
- 1
Review all bidding and contract documents available in the portal, including the Contract Manual, Plans, Bid Proposal Workbook, and Small Business Utilization Form
- 2
Submit all required documents via the Bonfire portal by 2:00 PM CST on January 14, 2027 by Jan 14, 2027, 2:00 PM
- 3
Ensure all documents are clear, legible, and complete before final submission by Jan 14, 2027, 2:00 PM
What you'll need
Prequalification
RequiredSubmission
Electronic portal
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Submissions must be finalized and uploaded prior to the due date and time. Bidders are responsible for ensuring all documents are clear, legible, and complete. Failure to submit all required information will result in rejection as non-responsive. No late bids will be accepted. If a bid is unreadable due to technical failure of the Bonfire Platform, the bidder must provide clear and convincing evidence that the unreadable condition was caused solely by error or malfunction of the platform. Failure to scan a clear copy into the system does not constitute a platform malfunction. Addenda will be issued as needed. The project is advertised in the Fort Worth Star-Telegram on November 18 and November 25, 2026.
Key dates
- Pre-bid meeting
- Jan 5, 2027, 2:00 PM Central Time
- Bids due
- Jan 14, 2027, 2:00 PM CT
More from this agency
- RFQ for Energy Audit and Weatherization Equipment · closes Nov 27, 2026
- RFP Odor Control for the Water Department · closes Dec 3, 2026
- 2027 NIP Asphalt Resurfacing Project 1 & 2, City Project Numbers 107021 & 107209 · closes Dec 3, 2026
- RFP Submersible Pump Service and Repair · closes Dec 3, 2026
- PW RFQ for Professional Engineering Design and Consultant Services for Delivery of Studies, Planning, Engineering and… · closes Dec 3, 2026
Similar bids near Fort Worth
- Sanitary Sewer Rehabilitation Contract 119 · Fort Worth · closes Dec 17, 2026
- Sanitary Sewer Rehabilitation Contract 119 (Project) · Fort Worth · closes Dec 17, 2026
- Water and Sanitary Sewer Replacement and Pavement Rehabilitation Contract · Fort Worth · closes Jan 7, 2027
- Water and Sanitary Sewer Rehabilitation Contract 2023, WSM-J · Fort Worth · closes Jan 7, 2027
- Construction of Waterway Lift Station Rehabilitation · Arlington · closes Dec 10, 2026
Closing soon near Fort Worth
- Vocational Training – Cosmetology Instructor Services for FMC Carswell, TX · Fort Worth · closes Nov 27, 2026
- General Services Administration Lease: Office Space in Tulsa, Oklahoma · Fort Worth · closes Nov 27, 2026
- District Access Control Program Upgrade and Expansion Design · Fort Worth · closes Nov 30, 2026
- Annual Purchase for EV Reach Subscription Renewal · Fort Worth · closes Dec 2, 2026
- Furniture, Fixtures, and Equipment (FF&E) for CISD Track Project · Fort Worth · closes Dec 2, 2026