OpenRFPCloses Jan 6, 2027

400 Mack Elevator and Accessibility Addition and Modernization

Wayne State UniversityDetroit, Michigan#592-426947

Wayne State University is seeking proposals for the 400 Mack Elevator and Accessibility project in Detroit, MI. This project involves modernizing an existing elevator (PE1) and installing a new elevator (PE2) in an adjacent shaft, ensuring one elevator remains operational at all times. The scope also includes upgrades to the elevator machine room, alarms, fire protection, and modifications to the main entry vestibule.

On PublicBidSearch: the original bid posting, 10 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 6, 2027
Submission
electronic submission
Documents analyzed
10 published · 2 analyzed

Scope of work

  • Modernize existing hydraulic elevator (PE1) and install new hydraulic elevator (PE2).
  • Located at 400 Mack Avenue, Detroit, MI.

Steps to Bid

  1. 1

    Register to receive bid notices via the Bid Opportunities ListServ.

    Go to [link available with Pro], and click on the “Join our ListServ” link.

  2. 2

    Attend the Mandatory Pre-bid Meeting. was Nov 18, 2026, 11:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    Sign-in sheet will be posted to the website at [link available with Pro]. Attendance is mandatory.

  3. 3

    Conduct an Optional Site Visit. was Nov 20, 2026, 7:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    Meet at the main entrance.

What you'll need

Prequalification

Required

Contract duration

To be negotiated

Submission

Electronic submission

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Key dates

Questions due
Dec 2, 2026, 12:00 PM Eastern Time
Pre-bid meeting
Nov 18, 2026, 11:00 AM Eastern Time · Mandatory
Site visit
Nov 20, 2026, 7:00 AM Eastern Time
Bids due
Jan 6, 2027

Documents

  • FPM-400-Mack-Elevator-and-Accessibility-Vendor.pdf
  • FPM-400-Mack-Elevator-and-Accessibility-Specs.pdf157 pages
  • FPM-400-Mack-Elevator-and-Accessibility-Drawings.pdf
  • FPM-400-Mack-Elevator-and-Accessibility-Presentation.pdf24 pages
  • FPM-400-Mack-Elevator-and-Accessibility-Addendum-1.pdf3 pages
  • 400-Mack-and-Elevator-Accessibility-Pre-Bid-Sign-In-Sheet.pdf1 pages
  • FPM-COHN-Garden-Level-Interior-Upgrades.pdf
  • FPM-Cohn-Garden-Level-Interior-Upgradesw-Specification.pdf56 pages

2 more files

See all documents · Download with Pro

More from this agency

Closing soon near Detroit