WWRF Recycled Water Pond Erosion Prevention Project
Western Municipal Water District — EngineeringRiverside, California#W-335
Western Municipal Water District is soliciting bids for the WWRF Recycled Water Pond Erosion Prevention Project (Specification No. W-335). The project involves permanent erosion repair and prevention for the Recycled Water (RW) Pond at the Western Water Recycling Facility. Scope includes slope stabilization, roadway repair, railing installation, and storm drainage improvements. Work must maintain continuous operation of the RW Storage Pond and minimize disruptions. Specific work on pond slopes is restricted to July 1 - October 15 and when the pond water surface elevation is at or below 1516.0 feet. Permissible working hours are 7:00 a.m. to 6:00 p.m., Monday through Saturday. A mandatory pre-bid conference and site walk is scheduled for December 7, 2026, at 10:00 AM at 22751 Nandina Ave, Perris, CA 92518. Bidders must be licensed Class A - General Contractors and registered with the Department of Industrial Relations. A bid bond of 10% of the total bid price is required. Performance and payment bonds of 100% of the contract amount will be required from the successful bidder.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026
- Time stated in bid documents
- Dec 18, 2026, 12:00 PM Pacific Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 240 calendar days from the commencement date stated in the Notice to Proceed
- Documents analyzed
- 5 published · 2 analyzed
Steps to Bid
- 1
Register as a Vendor with the District’s Procurement Portal (PlanetBids).
[link available with Pro]
- 2
Download Contract Documents and register as a Plan Holder.
[link available with Pro]
- 3
Attend the MANDATORY Pre-Bid Conference and Site Walk. by Dec 7, 2026, 10:00 AM
Location: 22751 Nandina Ave, Perris, CA 92518
- 4
Submit written questions for interpretation or correction. by Dec 10, 2026, 2:00 PM
Using the Q&A tab in PlanetBids.
- 5
Submit Bid Bond (electronic or hard copy). by Dec 18, 2026, 12:00 PM
Electronic surety bond via Surety2000 through PlanetBids, or hard copy original Bid Bond, cashier’s check, or certified check delivered to 14205 Meridian Parkway, Riverside CA 92518.
- 6
Submit Bid electronically through Western’s PlanetBids Procurement Portal. by Dec 18, 2026, 12:00 PM
No paper, facsimile, or email submittals will be accepted.
What you'll need
Bid security
RequiredThe successful Bidder will be required to furnish the District with a Performance Bond equal to one hundred percent (100%) of the successful Bid, and a Payment (Labor and Materials) Bond equal to one hundred percent (100%) of the successful Bid, prior to execution of the Contract.
Contract duration
240 calendar days
Submission
Electronic portal
NAICS
237990, 238990
How to submit
All Bids must be submitted electronically through Western’s PlanetBids Procurement Portal. No paper, facsimile, or email submittals will be accepted.
In person/mail: 14205 Meridian Parkway, Riverside CA 92518
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The goal of this Project is to provide permanent erosion repair and prevent future erosion of the existing Recycled Water (RW) Pond at the Western Water Recycling Facility (WWRF). The WWRF current average daily wastewater flow is around 1.5 MGD. Tertiary effluent from the plant is discharged to the recycled water storage pond. When the flow of recycled water exceeds irrigation demands, the excess treated water is stored in the existing pond until demand increases. The current storage pond capacity is 35 million gallons (MG). The work generally consists of slope stabilization, roadway repair, installation of railings, storm drainage improvements, and all associated appurtenances and miscellaneous work necessary to provide the District with a complete and properly functioning project. All work shall be performed in a manner that maintains continuous operation of the RW Storage Pond and minimizes disruptions to pond storage capacity, facility operations, and recycled water distribution to customers. The Contractor shall be responsible for protecting existing facilities and operations throughout construction and shall perform all work necessary to provide the District with a complete and functioning facility. The remaining work associated with the roadway and railings can be performed outside of these months. Contractor shall coordinate all work activities with the District to confirm acceptable site access and pond operating conditions prior to mobilization and throughout construction. The permissible working hours within the WWRF are between 7:00 a.m.
Key dates
- Questions due
- Dec 10, 2026, 2:00 PM Pacific Time
- Pre-bid meeting
- Dec 7, 2026, 10:00 AM Pacific Time · Mandatory
- Site visit
- Dec 7, 2026, 10:00 AM Pacific Time
- Bids due
- Dec 18, 2026
- Expected award
- Feb 17, 2027, 10:30 AM Pacific Time
Documents
- 20261117101211039_Volume_1_-_WWRF_RW_Pond_Erosion_Prevention_-_Front_End_Spe.pdf127 pages
- 20261117101216959_Volume_2_-_WWRF_RW_Pond_Erosion_Prevention_-_Bid_Set_Tech_.pdf
- 20261117101220592_Volume_3_-_WWRF_RW_Pond_Erosion_Prevention_-_Bid_Set_Drawi.pdf16 pages
- 20261117101225616_Attachment_A_-_Geotechnical_Report.pdf
- 20261117101228133_Attachment_B_-_Testing_Results.pdf
Similar open bids
- Storm Drain Repairs on Palos Verdes Drive West and South — City of Rancho Palos Verdes
- Villa La Jolla Storm Drain System Lining — City of San Diego
- As-Needed Stormwater Review Services — City of Encinitas
- Bagdouma Park and Orchard Street Drywell Installation Project, City Project No. SD-04 — City of Coachella
- Construct and Install Stormwater Treatment BMPs and MVPs — California DOT (Caltrans)
Closing this week nearby
- 2027 Annual Pavement Rehabilitation Project – Professional Design Services RFP — closes Nov 20, 2026
- RFP – Country Club Drive Pavement Rehabilitation and Active Transportation Design Services — closes Nov 20, 2026
- 2026 Affordable Housing Notice of Funding Availability — closes Nov 20, 2026
- On-Call Armed Security Guard Services for the City of Santa Rosa Police Department — closes Nov 20, 2026
- Construction Manager at Risk for BMR Building at Middlefield Development — closes Nov 20, 2026