OpenRFPCloses Nov 27, 2026, 2:00 PM CT

Mazak FUSE System for Defense Manufacturing Program

Department of Energy — ORNL UT-BATTELLE LLC-DOE CONTRACTOROak Ridge, Tennessee#RFP510922

UT-Battelle LLC's Defense Manufacturing Program Office (DMPO) requires an integrated manufacturing system consisting of subtractive machining, wire arc additive manufacturing (WAAM), blank machine stations, pallet changer modules, and a two-level PALLETECH system with associated engineering and interfaces per Attachment A - Statement of Work - Mazak FUSE System or domestic equivalent.

On PublicBidSearch: the original bid posting, 10 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 27, 2026, 2:00 PM CT
Documents analyzed
10

Scope of work

  • Furnish and integrate a Mazak FUSE manufacturing system.
  • Include one subtractive machine, one WAAM station, two blank machine stations.
  • Provide five pallet changer modules and one two-level PALLETECH system with 32 pallets.
  • Complete system engineering, configuration review, and interface engineering.
  • Deliver, install, and support final acceptance at ORNL MDF in Knoxville, TN.

Steps to Bid

What you'll need

Contract duration

13 to 14 months ARO

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

UT-Battelle LLC, managing and operating contractor for Oak Ridge National Laboratory (ORNL), requires an integrated manufacturing system for its Manufacturing Demonstration Facility (MDF) in Knoxville, Tennessee. The scope includes furnishing, configuring, integrating, delivering, and installing the Mazak FUSE system, all equipment, engineering, configuration documentation, customized system layout, PMC-to-machine connection engineering, pallet handling integration, and the interface connection to the heat treatment module. The heat treatment module itself is excluded from this scope. Key objectives include furnishing a fully integrated system, providing specific quantities of machine stations and pallet changer modules, completing system engineering and configuration review, conducting pre-shipment runoff testing, and delivering, installing, and supporting final acceptance of the system. All provided items must meet published performance specifications by Mazak. Fabrication, machine configuration, integration, engineering, general assembly, and runoff testing will occur at the Seller’s facility, while delivery, installation, site integration, and final acceptance will occur at ORNL MDF in Knoxville, Tennessee. The project duration is estimated to be within 13 to 14 months after receipt of order (ARO).

Key dates

Questions due
Nov 20, 2026, 3:00 PM Central Time
Bids due
Nov 27, 2026, 2:00 PM CT

Documents

  • Attachment_A_-_Statement_of_Work_-_Mazak_FUSE_System.pdf6 pages
  • Attachment_B_-_Terms-Conditions-Commerical-Products-and-Services-BSD-CS-2146.pdf17 pages
  • Attachment_C_-_Prime-Flowdown-Clauses-BSD-CS-2258-09.30.2026.pdf9 pages
  • Attachment_D_-_Reps-and-Certs-Abbreviated_-_2026.03.09.pdf6 pages
  • Attachment_E_-_Fixed_Price_Subcontract_-_Draft.pdf10 pages
  • Attachment_F_-_Representations_Regarding_Small_Business_Subcontracting_Plan_.pdf1 pages
  • Attachment_G_-_Certification-Exemption-from-SCLS-Certain-Services-BSD-CS-204.pdf1 pages
  • Attachment_H_-_BSD-CS-2290-C-SCRM-Questionnaire.pdf2 pages

2 more files

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby