Yellow Lake Disaster Relief Project – Watershed Restoration and Recreational Access Management
Forest Service — USDA-FS, CSA INTERMOUNTAIN 1Kamas, Utah#1284LL27Q0005
The Forest Service is seeking a contractor to restore land on the Uinta-Wasatch-Cache National Forest after the 2024 Yellow Lake fire. The project includes placing 1,300 boulders (4–6 ft) across 17 sites, with optional mechanical pitting and reseeding. Work must occur between June and October. Bidders must submit a technical proposal, quality control plan, past performance form, and pricing via email. The contract is a firm-fixed-price, two-year agreement. Contractors must comply with Service Contract Act wage rates and environmental standards.
Overview
- Due
- Nov 9, 2026
- Time stated in bid documents
- Nov 9, 2026, 11:00 AM Mountain Time
- Submission
- Contract term
- two years
- Documents analyzed
- 4
Scope of work
- Place 1,300 boulders (4–6 ft) across 17 locations
- Perform mechanical scarification/pitting across 3 acres in 10 locations
- Apply approved seed mix across 4.5 acres in 10 locations
- Submit monthly and annual status reports
- Submit end-of-project report
Steps to Bid
- 1
Register in Official linkPro and obtain a UEI.
- 2
Review the full solicitation, including the Statement of Work, attachments, and FAR/AGAR clauses.
- 3
Submit questions electronically to Shawn Harwood at [email available with Pro] by November 5, 2026, at 11:00 AM Mountain Time. was Nov 5, 2026, 11:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Prepare and submit a quote via email to [email available with Pro] by November 9, 2026, at 11:00 AM Mountain Time. was Nov 9, 2026, 11:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 5
Ensure all required documents are included: completed SF-1449, Schedule of Items, Relevant Past Performance Form, Technical Proposal, and Quality Control Plan. was Nov 9, 2026, 11:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 6
Verify receipt of the quote by the Contracting Officer.
What you'll need
Contract duration
11/13/2026 to 11/01/2028
Submission
NAICS
115310
How to submit
Submit all documents in one email as separate attachments. Do not include cover pages or pictures. Use a minimum 10-point font. Pages exceeding limits will not be evaluated. Submit the SF-1449, Schedule of Items, Relevant Past Performance Form, Technical Proposal, and Quality Control Plan. Only return documents requested. Do not return the entire solicitation.
Get alerts for bids like this
New consulting bids in Utah
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The Yellow Lake Disaster Relief Project is a two-year initiative focused on restoring land on the Uinta-Wasatch-Cache National Forest, Heber-Kamas Ranger District, following the 2024 Yellow Lake fire that burned 33,173 acres. The project aims to enhance wildlife habitat, restore watershed and stream systems, rehabilitate soil stability, and improve recreation access. Work includes placement of 1,300 boulders (4–6 feet in size) across 17 locations, totaling approximately 3 miles. Boulders must be placed in pits one-third the size of the boulder, spaced 40–50 inches apart, and at least 30 feet from forest roads. A second option includes mechanical scarification/pitting across 3 acres in 10 locations using tracked equipment to create alternating soil pits and spoils. A third option involves seed application in 4.5 acres across 10 locations using approved seed mix (e.g., bluebunch wheatgrass, mountain brome, fescue, penstemon, goldeneye, flax) at specified seeding rates. All work must be conducted during the non-snow season (June–October). The contract is a firm-fixed-price, two-year agreement with a period of performance from November 13, 2026, to November 1, 2028. The contractor must comply with Service Contract Act wage rates for all labor, including fringe benefits, and must adhere to environmental and safety standards.
Documents
- C04a_1284LL27Q0005_Yellow_Lake_Disaster_Relief.pdf37 pages
- C04b_Attachment_1_-_Schedule_Of_Items.docx
- C04c_Attachment_2_-_Relevant_Past_Performance_Form.pdf1 pages
- C04d_Attachment_3_-_Wage_Determination.pdf7 pages
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- ANF Duchesne Bunkhouse AC Replacement — closes Nov 20, 2026
- Ross Springs Waterline Replacement — closes Dec 1, 2026
- GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation — closes Dec 15, 2026
Similar open bids
- Landing Gear Collaborative Supply Chain Integration II — DEFENSE LOGISTICS AGENCY
- RFP- Wasatch Back Wildfire Summit — Summit County
- Swimming Pool Facility – Sale, Rental, Lease, or Management Use – Request for Proposals — Orderville
- Request for Proposal - Strategic Plan Development for Saratoga Springs, UT — Saratoga Springs
- RFP for Airport Planning Services for the Milford Municipal Airport — Milford
Closing this week nearby
- City of Holladay- Security Systems — closes Nov 12, 2026
- City of Holladay- Audio/Visual System Upgrade — closes Nov 12, 2026
- WIC Pharmacy Services — closes Nov 12, 2026
- 16292 Steam Boiler Replacement — closes Nov 12, 2026
- SLCo LIB134137 Library Operations Building Renovation - CONST — closes Nov 12, 2026