ClosedRFI

Stabilization of Staple Bend Tunnel

National Park Service — DOI, NPS CONOPS STRATEGICNationwide (Federal)#140P4226R0026

The National Park Service (NPS) is seeking a contractor for the stabilization of the Staple Bend Tunnel at the Allegheny Portage Railroad National Historical Site (ALPO) in Gallitzin, PA. This is a 100% Small Business set-aside acquisition. The NAICS code is 237990. The project includes base items such as stabilization maintenance, scaling, fossil inventory, rock bolt anchors, void fill concrete, gunite application, drainage installation, and signpost construction. Optional items include a 3D scan and bat houses. The period of performance is approximately 190 days after Notice to Proceed, with mobilization anticipated after October 1, 2026. Offers will be evaluated using the Lowest Price Technically Acceptable (LPTA) process. Contractors must be registered in [link available with Pro].

On PublicBidSearch: the original bid posting, 12 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Oct 30, 2026
Time stated in bid documents
Oct 30, 2026, 10:00 PM
Submission
electronic portal

Scope of work

  • Stabilization Maintenance Plan with rock bolting and man lift inspection.
  • Scaling of loose or unstable rock from tunnel crown and walls.
  • Fossil identification and inventory by a paleontologist.
  • Gunite application with wire mesh installation.

Steps to Bid

  1. 1

    Obtain solicitation package from Official linkPro.

    All amendments will be posted on [link available with Pro]. Contractors are responsible for obtaining amendments.

  2. 2

    Register in the System for Award Management (SAM) database.

    Failure to register in [link available with Pro] before award will make a firm ineligible for award.

  3. 3

    Submit proposal. was Oct 30, 2026, 5:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

    Specific instructions on submitting proposals will be contained in the solicitation documents.

What you'll need

Contract duration

Approximately 190 days after Notice to Proceed

Award method

Lowest Price Technically Acceptable

Submission

Electronic portal

NAICS

237990

How to submit

Specific instructions on submitting proposals will be contained in the solicitation documents. All questions and phone calls will be addressed after the solicitation is posted through official amendments.

Get alerts for bids like this

New furniture and equipment bids

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The Department of the Interior (DOI) on behalf of the National Park Service - Allegheny Portage Railroad National Historic Site (ALPO) is seeking one (1) contractor with tunnel stabilization experience to provide all labor, supervision, materials, tools, supplies, transportation, personal protection equipment, and support equipment incidental for the stabilization of the Staple Bend Tunnel located at ALPO. The general scope of work includes: Base item work consists of: Stabilization Maintenance Plan - This item consists of a rock bolting crew and a man lift to access existing rock bolts. The crew shall inspect the tunnel walls and rock bolts on the walls by foot, and use the man lift to inspect the crown and rock bolts on the crown. Documentation shall include an action plan for areas of concern, and surveyed dimensions of the tunnel. Scaling - This item consists of a scaling crew and a man lift to access the tunnel crown and walls. The scaling crew shall inspect and remove excess, loose, or unstable rock that poses a hazard of falling, excluding removal of keystone blocks or material whose removal could result in loss of supporting rock behind. A paleontologist, meeting the professional standards set forth in Paleontological Resources Preservation Act of 2009 (PRPA) (16 U.S.C. § 470aaa 1-11), shall inspect the tunnel for fossils for preservation with help of a man lift and operator to access the crown. Rock Bolt Anchors - This item consists of a rock bolting crew, rock bolting equipment, and materials to manufacture rock bolts (threaded rebar, bearing plate, nuts, washers, and grout). Rock bolting crew shall cut and assemble metal to designed rock bolt specifications and install them with equipment and grout. Void Fill Concrete - This item consists of a concrete crew and equipment, concrete, and concrete forms. Concrete crew shall install forms along voids and inject concrete between the rock and form according to design plans. Gunite - This item consists of a mesh installation crew, Gunite installation crew, man lift, wire mesh, and associated anchoring/bolting and shotcrete equipment. Crews shall install wire mesh using a man lift and anchoring/bolting equipment to attach the mesh to the tunnel crown or wall. Drainage - This item consists of a drainage crew, French drainpipe, strip drains and equipment. Crew shall excavate and install a French drain on the floor of the tunnel near each wall along with installing strip drains in the crown and walls. Signposts - This item consists of a construction crew and materials for signage. Crew shall construct or purchase signs to be installed. Optional/Additive Items work consists of (Subject to Availability of Funding): Optional Item 1: 3D Scan - This item consists of a licensed surveying crew with an equipment rental and report submittal. Surveying crew shall use equipment to make a 3D scan of the tunnel and develop a report. Optional Item 2: Bat Houses - This item consists of a pre-built house installed for bats that may occupy the tunnel. The procurement is being solicited under the Revolutionary FAR Updates (RFO) - Simplified Acquisition Procedures under RFO FAR 12 - Acquisition of Commercial Products and Commercial Services, which now includes Construction under RFO Part 36, as authorized by RFO FAR 12.200 (b). The requirement also includes original Federal Acquisition Regulations (FAR) that have not been implemented by the DOI under the RFO. Evaluation of quotes/offers will be conducted in accordance with RFO FAR 12.203 and, the Lowest Price Technically Acceptable process as defined in FAR 15.101-2 shall be used in the requirement as authorized by RFO FAR 12.203 (c)(3). The Government will issue a single firm fixed price contract in accordance with FAR 16.2. All prospective contractors must be registered in the System for Award Management (SAM) database at [link available with Pro] before award of contract; failure to register in the SAM database shall cause your firm to be ineligible for the award and removed from consideration. As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c)(3)), the offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 2902, subpart B) to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.

Documents

  • Sol_140P4226R0026_Amd_0001.pdf2 pages
  • Sol_140P4226R0026.pdf79 pages
  • B08_-_Attachment_4_-_Location_Maps-Lab_Testing_Report-Photos.pdf
  • B08_-_Attachment_10_-_Proposal_Submission_Package_-_140P4226R0026.docx
  • B08_-_Attachment_9_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx
  • B08_-_Attachment_6_-_ALPO_Staple_Bend_Tunnel_Preservation-1999_CDs.pdf30 pages
  • B08_-_Attachment_7_-_ALPO_Staple_Bend_Tunnel_-_Submittal_List.xlsx
  • B08_-_Attachment_8_-_CON_WD_-_PA20260002_-_Heavy_and_Highway_-_7_30_2026.pdf

4 more files

See all documents · Download with Pro

Similar bids nearby

Closing soon nearby