OpenConstructionCloses Jan 21, 2027, 6:00 AM CT

Site Utility Improvements

Department of Health Services — Department of Administration — Division of Facilities Development (DFD)Oshkosh, Wisconsin#23K2J

This is a capital construction project for Site Utility Improvements at the Winnebago Mental Health Institute, managed by the Wisconsin Department of Administration — Division of Facilities Development (DFD). The project includes constructing new utility corridors, a service tunnel, replacing medium voltage switchgear, relocating primary electric, signal, and sewer lines, demolishing existing structures (Nurses Annex, Kempster Hall), repairing service tunnels, upgrading steam service, and replacing watermains. A/E is Ring & Duchateau Llp.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 21, 2027, 6:00 AM CT
Submission
electronic portal, mail, third-party delivery, hand delivery
Documents analyzed
6
Required submission items
10 items · full checklist with Pro

Scope of work

  • Construct new utility corridors around WMHI campus.
  • Build a new service tunnel to the Wisconsin Resource Center.
  • Replace medium voltage switchgear at the heating plant.
  • Relocate primary electric, signal, and sanitary/storm sewer to utility corridors.
  • Upgrade steam service to high pressure steam.

Steps to Bid

  1. 1

    Attend the non-mandatory pre-bid tour. by Dec 9, 2026, 9:00 AM

    Location: Winnebago Mental Health Institute, Fire House. Contact Robert Otremba or Josh Nickols for information.

What you'll need

Submission

Electronic portal, Mail, Third-party delivery, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 10-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project involves constructing new utilities at the Winnebago Mental Health Institute and a more secure means of delivering supplies to the Wisconsin Resource Center. The abandoned Nurses Annex will be demolished to provide a pathway for the new service tunnel. Sections of the remaining service tunnel will be repaired. Watermains will be replaced with more resilient materials. Utilities to individual buildings will be served by the new distribution system.

Key dates

Pre-bid meeting
Dec 9, 2026, 9:00 AM Central Time
Site visit
Dec 9, 2026, 9:00 AM Central Time
Bids due
Jan 21, 2027, 6:00 AM CT

Documents

  • 23K2J-01_GPC_A-1_Document.pdf2 pages
  • 23K2J-01_GPC_TOC.pdf12 pages
  • 23K2J-01_MEP_A-1_Document.pdf2 pages
  • 23K2J-01_MEP_TOC.pdf12 pages
  • 23K2J-01_Spec_Vol_2_TOC.pdf11 pages
  • 23K2J-01_Spec_Vol_3_TOC.pdf10 pages

See all documents · Download with Pro

More from this agency

Similar bids near Oshkosh

Closing soon near Oshkosh