0.24 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, storm sewer, signing, and pavement markings on Hewitt Road from Packard Road to M-17 (Washtenaw Avenue), Washtenaw County
Michigan Department of Transportation — MDOTMichigan#81000-214699
This is a construction project for 0.24 miles of hot mix asphalt cold milling and resurfacing, along with concrete curb, gutter, sidewalk, ramps, storm sewer, signing, and pavement markings on Hewitt Road from Packard Road to M-17 (Washtenaw Avenue) in Washtenaw County, Michigan. The project is managed by a Local Agency under MDOT. SBP participation is required at 4.00%. The bid is due December 4, 2026, at 10:30 AM local time at 425 W. Ottawa St., Lansing, MI 48933. The project is expected to be completed by September 30, 2027.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 10:30 AM Eastern Time
- Submission
- hand delivery, mail
- Contract term
- 12 months + Two additional 12-month renewal terms
- Documents analyzed
- 1
Steps to Bid
- 1
Attend the mandatory pre-bid meeting on Thursday, October 15, 2026, at 10:00 AM at the MDOT Grand Rapids TSC Office, 2660 Leonard Street NE, Grand Rapids, MI 49525. was Oct 15, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit a bid proposal by the due date and time. by Dec 4, 2026, 10:30 AM
What you'll need
Submission
Hand delivery, Mail
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Subclassifications required: Cb, Ea, and J. Required SBP Participation: 4.00%. Estimated pages for plans: 20. Completion Date: September 30, 2027. Date advertised: November 13, 2026.
Key dates
- Bids due
- Dec 4, 2026
Documents
- ads.pdf49 pages
More from this agency
- 0.06 mi of Hot Mix Asphalt Widening, Concrete Curb, Gutter, Sidewalk, and Ramps on I-94BL at Ravenswood Road in… · closes Dec 4, 2026
- 0.31 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, traffic signal,… · closes Dec 4, 2026
- 10.10 mi of hot mix asphalt cold milling and resurfacing, corrugations and pavement markings on I- 94 from 40th Street… · closes Dec 4, 2026
- Traffic Signal Installation on US-41 at Quincy Street, City of Houghton, Houghton County, Michigan · closes Dec 4, 2026
- Design-Build Project: Construction of a Drainage Tunnel, Tunnel Components, and Pump Station for I-94 Modernization… · closes Dec 11, 2026
Similar bids in Michigan
- Angling Road Elementary Site Clearing Package — Portage Public Schools · closes Nov 30, 2026
- Elmira Township Road Resurfacing · closes Dec 15, 2026
- Traffic Signal Modernization on Lapeer Road, Wadhams Street, and 24th Street, St. Clair County · closes Dec 4, 2026
- Tree Removal in the Clear Zone on US-12 from Concord Road to Fowle Road, Jonesville, Hillsdale County, MI · closes Dec 4, 2026
- 4.14 mi of hot mix asphalt cold milling and resurfacing, joint repairs, concrete sidewalk and pavement markings on M… · closes Dec 4, 2026
Closing soon in Michigan
- Pankow Floral Cooler Replacement and Mechanical System Upgrade · closes Dec 1, 2026
- FI 132 Condemned for Use Tag · closes Dec 2, 2026
- RFP for Capital Project on a Design-Build Basis · closes Dec 2, 2026
- Custodial Services · closes Dec 3, 2026
- Compact Utility Tractor with Grapple (Kubota L3302HST) – Request for Quotes · closes Dec 4, 2026