Traffic Signal Modernization on Lapeer Road, Wadhams Street, and 24th Street, St. Clair County
Michigan Department of Transportation — MDOTMichigan#77000-219491
This is a construction project to modernize traffic signals and pedestrian actuation systems on Lapeer Road, Wadhams Street, and 24th Street in St. Clair County, Michigan. The scope includes replacing signal cabinets, controllers, and box span signals, and installing pedestrian actuation. The work is being performed by a Local Agency under MDOT oversight. The bid is due December 4, 2026, at 10:30 AM local time at the MDOT Lansing office. The project is expected to be completed by June 30, 2028.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 10:30 AM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 1
Scope of work
- Replace existing traffic signals on Lapeer Road from Wadhams Road to 32nd Street
- Upgrade pedestrian actuation systems on 24th Street from Lapeer Avenue to Court Street
- Modernize signal control systems and integrate with central traffic management
Steps to Bid
- 1
Register with MDOT eProp system to access proposal and plans.
- 2
Review the full bid package, including plans, specifications, and addenda, available at <Official linkPro>.
- 3
Submit questions to the MDOT Bid Office by 10:30 AM on November 13, 2026, via email to [email available with Pro]. was Nov 13, 2026, 10:30 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Attend the mandatory pre-bid meeting on Thursday, October 15, 2026, at 10:00 AM at the MDOT Grand Rapids TSC Office, 2660 Leonard Street NE, Grand Rapids, MI 49525. was Oct 15, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project includes replacement of existing signal infrastructure with modernized components, integration of pedestrian detection and actuation, and associated electrical and control system upgrades. Completion is scheduled for June 30, 2028. The net classification is 1442 L. The project is advertised for bid on December 4, 2026, with a bid opening at 10:30 AM local time at 425 W. Ottawa St., Lansing, MI 48933.
Key dates
- Pre-bid meeting
- Oct 15, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 4, 2026
Documents
- ads.pdf49 pages
More from this agency
- Tree Removal in the Clear Zone on US-12 from Concord Road to Fowle Road, Jonesville, Hillsdale County, MI · closes Dec 4, 2026
- 4.14 mi of hot mix asphalt cold milling and resurfacing, joint repairs, concrete sidewalk and pavement markings on M… · closes Dec 4, 2026
- 0.87 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, signing, and… · closes Dec 4, 2026
- 0.39 mi of hot mix asphalt crushing, shaping, and resurfacing, culverts, guardrail, signing, and pavement markings on… · closes Dec 4, 2026
- 1.00 mi of Hot Mix Asphalt Surfacing, Aggregate Shoulders, Signing, and Pavement Markings on 3 Mile Highway East of M… · closes Dec 4, 2026
Similar bids in Michigan
- 5.08 mi of Hot Mix Asphalt Cold Milling and Resurfacing, Pavement Markings, Bridge Rehabilitation, and Pedestrian… · closes Dec 4, 2026
- Fenton Area Public Schools Elementary RTU Replacement at North Road and State Road · closes Dec 2, 2026
- 0.30 mi of Hot Mix Asphalt Surfacing, Storm Sewer, Curb Ramps, Signing, and Water Main on James Street from Main… · closes Dec 4, 2026
- Furnish and Deliver Fine Aggregates and Alternatives, as Specified · closes Dec 3, 2026
- Clipperview & Witmere Roads Paving Project (Norwood Township)
Closing soon in Michigan
- DeWitt High School Auditorium Renovation – 2026 Bond Project · closes Nov 24, 2026
- Secondary Campus Renovation & Botsford Elementary · closes Nov 24, 2026
- Transearch Contract/Freight Data · closes Nov 25, 2026
- Hydraulic Motor Pump Head · closes Nov 26, 2026
- Debris Removal in Back of Village Hall — Estral Beach, MI · closes Nov 30, 2026