ClosedConstruction

2026 Interstate Bridge Replacement Program - Independent Cost Estimate

Washington State DOT — WSDOTWashington

The process is two-step: first, a Request for Qualifications (RFQ) with a deadline of 4:00 p.m. PST on November 25, 2026. The selected firm will support WSDOT in evaluating the Progressive Design-Builder’s cost estimates and GMP, and may be used for future phases. Faxed submissions are not accepted. Submissions must be sent to [email available with Pro]. to 11:00 a.m. via Microsoft Teams. Questions must be submitted by 4:00 p.m. PST on November 13, 2026.

On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 26, 2026
Time stated in bid documents
Nov 25, 2026, 4:00 PM Pacific Time
Submission
email
Contract term
approximately 5 years + option for WSDOT to supplement it for additional time and money
Documents analyzed
7

Scope of work

  • Provide Independent Cost Estimate (ICE) services for the Interstate Bridge Replacement Program
  • Develop independent cost estimates at 30/60/90% design
  • Review the Progressive Design-Builder’s cost model and work schedule
  • Identify and resolve differences between the PDB’s cost estimate and the ICE
  • Support risk management and risk cost estimating
  • Participate in team meetings and site visits with WSDOT and the PDB

Steps to Bid

  1. 1

    Register with WSDOT's vendor portal and obtain a Statewide Vendor (SWV) number and Unified Business Identifier (UBI) number.

  2. 2

    Review the RFQ document and criteria definitions thoroughly.

  3. 3

    Submit any questions by 4:00 p.m. PST on Friday, November 13, 2026. was Nov 13, 2026, 4:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    If shortlisted, prepare and submit the RFP packet within two weeks of shortlist notification.

  5. 5

    Prepare for and attend the interview, which will be 45 minutes for presentation and 15 minutes for Q&A.

What you'll need

Contract duration

5 years

Submission

Email

NAICS

541330

Get alerts for bids like this

New bridge bids in Washington

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The Washington State Department of Transportation (WSDOT) is soliciting consultants to provide Independent Cost Estimate (ICE) services for the Interstate Bridge Replacement (IBR) Program. The agreement will be negotiated hourly rate. The RFP deadline is two weeks after shortlist notification. WSDOT reserves the right to reject all submissions or waive irregularities. Questions must be submitted by 4:00 p.m. PST on Friday, November 13, 2026, and will only be addressed if deemed germane and not adequately addressed in the solicitation. The solicitation is advertised in the Seattle Daily Journal of Commerce and WEBS on November 3, 2026.

Documents

  • 2026-Bridge-Replacement-Cost-Estimate-RFP.pdf14 pages
  • 2026-Bridge-Replacement-Cost-Estimate-Def.pdf4 pages
  • Consultant-Info-Sheet.pdf1 pages
  • Performance-Evaluation-Reference.pdf4 pages
  • Perf-Eval-WSDOT-Projects.pdf1 pages
  • ContractorCertification.pdf1 pages
  • 2026-Bridge-Replacement-Cost-Estimate-Questions.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar bids in Washington

Closing soon in Washington