Pavement Rehabilitation & Resurfacing on Various County Roads — Project RB26.4
Coweta CountyGeorgia#RB26.4
Scope includes milling, full depth reclamation, patching, grading, thermoplastic striping, and asphalt placement. Work at the school lot is to be scheduled during school breaks. Bids must be submitted by 11:00 a.m. on the same day. The Owner may reject any or all bids.
On PublicBidSearch: the newspaper notice and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 14, 2026
- Submission
- mail, hand delivery
Scope of work
- Milling asphalt concrete pavement: 93,600 SY
- Full depth reclamation: 10” depth (6,100 SY), 8” depth (6,300 SY)
- Recycled asphalt patching: 17,200 tons (9.5mm, 12.5mm, Perma Flex, 19mm)
- Grading and shoulder rebuilding: along repaved roads without curb and gutter
- Thermoplastic striping: on all repaired roads
- School parking lot rehabilitation: 19,100 SY milling, 4,800 SY deep patching, 3,000 tons of 19mm and 12.5mm asphalt concrete
Steps to Bid
What you'll need
Submission
Mail, Hand delivery
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
Construction of pavement rehabilitation and resurfacing on various county roads, including milling of asphalt concrete pavement (93,600 square yards), full depth reclamation at 10-inch depth (6,100 square yards), full depth reclamation at 8-inch depth (6,300 square yards), recycled asphalt concrete patching (17,200 tons) in 9.5mm, 12.5mm, Perma Flex, and 19mm sizes, grading to heal drop-offs and rebuild shoulders along repaved roads without curb and gutter, thermoplastic striping, and pavement rehabilitation and resurfacing at a school parking lot off Mary Freeman Road. The school lot work is to be performed on days when school is not in session and includes milling (19,100 square yards), deep patching (4,800 square yards), and placement of 3,000 tons of 19mm and 12.5mm asphalt concrete. Bids must be submitted sealed and clearly marked. Bids must be received by 11:00 a.m. Bids received after that time will not be considered.
Key dates
- Bids due
- Dec 14, 2026
Similar bids in Georgia
- Centerville - Rosebud Road at Caleb Road and Lenna Drive Intersection Improvement Project · closes Dec 17, 2026
- Procurement of VIP Parking Lot Work at Augusta Regional Airport · closes Dec 3, 2026
- Southwest Georgia Regional Airport North T-Hangar Development Project · closes Dec 17, 2026
- Cook Road Waterline Replacement — Bid Item #26-280 · closes Nov 30, 2026
- Goodson Road Culvert Repair · closes Dec 10, 2026
Closing soon in Georgia
- Marquee Sign Replacement - Henry H. Brighman · closes Dec 1, 2026
- AGING-RELATED SERVICES FOR THE CSRA (non-nutrition) · closes Dec 1, 2026
- IFB 004-27 Milk and Milk Products · closes Dec 2, 2026
- North Green Street Sidewalk Improvements, City of Swainsboro, Georgia · closes Dec 3, 2026
- Annual Contract for Engineering and Environmental Services · closes Dec 3, 2026