The City of Swainsboro, Georgia is soliciting sealed bids for the construction of sidewalk and curb improvements on North Green Street. The scope includes 1,153 LF of concrete curb and gutter, 549 SY of 5-foot-wide, 4-inch-thick sidewalk, 86 SY of 4-foot-wide, 6-inch-thick sidewalk, 94 SY of 6-inch-thick valley gutter, and two concrete flumes. Work also includes traffic control, grassing of disturbed areas, and all related appurtenances. Substantial completion is required within 90 days, final completion within 120 days. Bids must be submitted by 2:00 PM local time on December 3, 2026, to Swainsboro City Hall. Drawings and specifications are available online and for purchase.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 3, 2026
- Time stated in bid documents
- Dec 3, 2026, 2:00 PM Eastern Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
Scope of work
- 2 units of concrete flume
- Traffic control and site restoration
Steps to Bid
- 1
Obtain plans and specifications from Official linkPro or by paying $75 for a digital copy and one printed copy of the specifications.
- 2
Request one printed full-size or reduced set of drawings at no additional charge, upon request.
- 3
Submit a sealed proposal on the official form, with prices in both words and figures, by 2:00 PM local time on December 3, 2026. by Dec 3, 2026, 2:00 PM
- 4
Submit the bid to Swainsboro City Hall, 211 North Main Street, Swainsboro, Georgia 30401. by Dec 3, 2026, 2:00 PM
What you'll need
Contract duration
90 consecutive calendar days for substantial completion; 120 consecutive calendar days for final completion
Submission
Mail, Hand delivery
NAICS
237130, 237999
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Substantial completion is required within 90 consecutive calendar days; final completion within 120 consecutive calendar days. The Georgia Department of Transportation Standard Specifications, 2021 Edition, and Supplemental Specifications, 2024 Edition, apply. Proposals must be submitted on the official form, with prices in both words and figures. Drawings and specifications are available at [link available with Pro]. A digital copy and one printed copy of the specifications are available for $75. One printed full-size or reduced set of drawings is available at no charge upon request.
Key dates
- Bids due
- Dec 3, 2026
Documents
- 202610_supportingdocs_PE-66723-NONST-2027-000000023-2026-10-30_16_06_29-8fb5.doc
More from this agency
Similar open bids
- North River Gap Sidewalk Project — Sandy Springs, City Of
- Taylor Park Improvements – Phase 1 — Bloomingdale, City Of
- PCC Slab Replacement on SR 421/I-516 Exit 5 NB Off-Ramp, Chatham County, Georgia — Georgia Department of Transportation
- General Contractor/Builder for the Housing Attainability Program — Gainesville, City Of
- Carver Lake Park – Phase 1 — Columbus Consolidated Government
Closing this week nearby
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Job Classification and Pay Study — closes Nov 20, 2026
- WWTP Expansion to 4.5 MGD — closes Nov 20, 2026