2026 Sewer Televising
City of Toledo — Transportation/Eng & Construction MgmtToledo, Lucas, Ohio#10009059
Work includes CCTV inspection, cleaning, and documentation of sewer conditions. The contract is for one year with two one-year renewal options.
On PublicBidSearch: the original bid posting, 9 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 8, 2026
- Time stated in bid documents
- Dec 8, 2026, 1:30 PM Eastern Time
- Submission
- electronic portal
- Contract term
- one year + two additional one-year renewal terms
- Documents analyzed
- 9
Scope of work
- Provide detailed video documentation of sewer conditions
- Submit inspection reports with findings and recommendations
- Comply with prevailing wage and labor standards
Steps to Bid
- 1
Register with the City of Toledo Division of Purchases and Supplies via the Vendor Registration Form.
- 2
Complete and submit the Business Tax Registration Form if new to the city.
- 3
Submit the Child Support Affidavit, notarized, and the Vendor Utility Account Status Verification form with the bid.
- 4
Attend the pre-bid meeting on November 29, 2026, at 10:00 AM ET via Zoom. by Nov 29, 2026, 10:00 AM
- 5
Submit all required paperwork via the City of Toledo e-procurement portal by December 8, 2026, at 1:30 PM ET. by Dec 8, 2026, 1:30 PM
What you'll need
Submission
Electronic portal
NAICS
561720, 561730
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Work includes inspection, cleaning, and documentation of sewer conditions using closed-circuit television (CCTV) equipment. The scope covers both public and private sewer lines within the city limits. Bidders must comply with all applicable prevailing wage and labor standards, including Ohio Revised Code Chapter 4115 and Toledo Municipal Code Chapter 187.
Key dates
- Pre-bid meeting
- Nov 29, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 8, 2026
Documents
- 20260311113246105_City_Paperwork_Packet_3.11.2026.pdf6 pages
- 20260311113246805_Annual_Paperwork_Packet_3.10.2026.pdf10 pages
- 20260605143010965_Tax_Exempt_Certificate_Construction_Pre-Filled.pdf1 pages
- 20260311133357066_Labor_Standards_Notice-LW_and_PW.pdf3 pages
- 20260311113247840_Paperwork_Schedule.pdf1 pages
- 20220118162452276_LOA_-_PLA_Public_Construction_Projects_Final_2021_COT.docx
- 20240801144144180_Bid_Spec_addition24.pdf1 pages
- 20240801144143714_PLA_FAQ24B.pdf2 pages
1 more file
More from this agency
- Rooftop Cooling Unit Replacement in the Laboratory Building · closes Dec 8, 2026
- Pedestrian Signal Poles, Bases, and Wire · closes Dec 8, 2026
- Emerald Avenue Shared Use Path Construction · closes Dec 8, 2026
- Summit Street Cycle Track Phase 2 – Reconstruction and Utility Replacement · closes Dec 15, 2026
- Secondary RAS SS Pumps and Valves Replacement · closes Dec 15, 2026
Closing soon near Toledo
- Cleaning Services at Department of Transportation Facilities · Toledo · closes Dec 1, 2026
- Snow Plow Operators with Vehicles for Snow & Ice Control · Toledo · closes Dec 1, 2026
- Lead-Based Paint Hazard Control Grant Program · Toledo · closes Dec 1, 2026
- Water Street Water Main Improvements – Phase 1, Village of Woodville, Ohio · Woodville · closes Dec 2, 2026
- FY27-28 Prequalified Architecture and Engineer Services · Toledo · closes Dec 4, 2026