Emerald Avenue Shared Use Path Construction
City of Toledo — DPU/Engineering ServicesToledo, Ohio#10009060
The City of Toledo is soliciting bids for the construction of a 0.91-mile shared use path on Emerald Avenue, from Anthony Wayne Trail to Ottawa Street. The scope includes an 11-foot-wide asphalt path, intersection redesign, roadway narrowing with curb replacement, and minor drainage improvements. A pre-construction meeting is mandatory. All subcontractors must also sign the PLA. A Court-Ordered Child Support Compliance Affidavit must be submitted.
On PublicBidSearch: the original bid posting, 9 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 8, 2026
- Time stated in bid documents
- Dec 8, 2026, 1:30 PM Eastern Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 3 years + two additional one-year renewal terms
- Documents analyzed
- 9
Scope of work
- Build 11' wide asphalt pavement path
- Redesign intersections geometrically
Steps to Bid
- 1
Complete and submit the Vendor Registration Form and Business Tax Registration Form if new to the city.
- 2
Submit the Court-Ordered Child Support Compliance Affidavit, notarized.
- 3
Submit the bid electronically via the City of Toledo e-procurement portal. by Dec 8, 2026, 1:30 PM
What you'll need
Submission
Electronic portal
NAICS
237130
How to submit
Submit the bid electronically via the City of Toledo e-procurement portal. The portal URL is Official linkPro. The bid must include all required forms and documents as listed in the required submittals section.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
A pre-construction meeting is mandatory prior to work commencement. The PLA requires all work to be performed by signatory contractors and mandates a pre-job conference for all tiers. Contractors must maintain accurate payroll records and make them available for inspection.
Key dates
- Bids due
- Dec 8, 2026
Documents
- 20260311133357066_Labor_Standards_Notice-LW_and_PW.pdf3 pages
- 20260311113246105_City_Paperwork_Packet_3.11.2026.pdf6 pages
- 20260311113246805_Annual_Paperwork_Packet_3.10.2026.pdf10 pages
- 20240326094634269_ODOT_PROJECTS_ONLY_-_PLA_Public_Construction_Projects_COT_.pdf18 pages
- 20260605143010965_Tax_Exempt_Certificate_Construction_Pre-Filled.pdf1 pages
- 20260311113247840_Paperwork_Schedule.pdf1 pages
- 20220118162452276_LOA_-_PLA_Public_Construction_Projects_Final_2021_COT.docx
- 20240801144143714_PLA_FAQ24B.pdf2 pages
1 more file
More from this agency
- Glendale Avenue Roadway Resurfacing, 0.76 Miles from Charmaine Drive to Detroit Avenue, Toledo, OH · closes Nov 24, 2026
- Snow Removal and Salting at Toledo Police Department Impound Lot · closes Nov 24, 2026
- Summit Street Cycle Track Phase 2 – Reconstruction and Utility Replacement · closes Dec 15, 2026
- Secondary RAS SS Pumps and Valves Replacement · closes Dec 15, 2026
- SDB Sludge Conveyors Rebuild · closes Dec 15, 2026
Similar bids near Toledo
- Rooftop Cooling Unit Replacement in the Laboratory Building · Toledo · closes Dec 8, 2026
- Community Violence Intervention & Prevention - Capacity Building & Microgrant Management · Toledo · closes Nov 24, 2026
- Library Tower Renovations · Portage · closes Dec 15, 2026
- Construction of Multi-Use Paved Trail and Pedestrian Bridge from Veterans Memorial Park to West 9th Street, Genoa, OH · Genoa · closes Nov 24, 2026
- Shelter - Storage Facility Rebid · Oak Harbor · closes Dec 9, 2026
Closing soon near Toledo
- Community Violence Intervention & Prevention - Training Provider · Toledo · closes Nov 24, 2026
- Code Compliance – Vehicle Towing Services (Nuisance Abatement)-REBID · Toledo · closes Nov 24, 2026
- Douglas Road Roadway Reconstruction · Toledo · closes Nov 24, 2026
- 3000 Tons (More or Less) of Liquid Carbon Dioxide · Toledo · closes Nov 24, 2026
- Rossburn, Roland & W Elm Tree Road Water Main Replacement · Bowling Green · closes Nov 25, 2026