OpenIFBCloses Dec 11, 2026

CAT Plant Riverside Ferry Dock and Shelter

Chatham Area Transit AuthoritySavannah, Georgia#PE-33123-NONST-2027-000000013

Plant Riverside Ferry Dock and Shelter Solicitation Type: Non-State Agency Agency: Chatham Area Transit Authority Government Type: other Closing: Dec 11, 2026 @ 02:00 PM ET NIGP Codes: 95990 Waterfront Construction Services: Piers, Docks, Decking, etc., Including Maintenance and Repair

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 11, 2026
Time stated in bid documents
Dec 11, 2026, 2:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
three (3) year
Documents analyzed
2 published · 1 analyzed

Scope of work

  • Design, permit, and construct a 15’x20’ concrete platform.
  • Design, permit, and construct a 6’ wide x 80’ long aluminum ADA gangway.
  • Design, permit, and construct a 20’ wide x 120’ long concrete floating dock.
  • Design, permit, and construct a 14’ x 24’ ± landing shelter.
  • Provide solar powered lighting for the platform, gangway, and dock.

Steps to Bid

What you'll need

Contract duration

18 months

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Chatham Area Transit Authority (CAT) is seeking qualified vendors to Design and Build a Ferry Dock and Shelter on Plant Riverside. The project is located behind the parking garage and hotel at 500 West River Street in Savannah, Georgia. It also includes a 14’ x 24’ ± landing shelter for ferry passengers located on the existing Riverwalk. The final design of the shelter must conform to the design shown on the Sottile & Sottile, 2022 plans. CAT anticipates awarding a three (3) year contract. The estimated project timeline is eighteen (18) months. Proposals are available at 900 E. Gwinnett Street, Savannah, Georgia, 31401, online at [link available with Pro], or by email at [email available with Pro].

Key dates

Questions due
Nov 30, 2026
Bids due
Dec 11, 2026
Expected award
Dec 16, 2026

Documents

  • 202611_supportingdocs_PE-33123-NONST-2027-000000013-2026-11-17_17_18_64-4442.pdf75 pages
  • 2027-05-RFP-CAT-PLANT-RIVERSIDE-FERRY-DOCK-AND-SHELTER-PACKAGE.cleaned.pdf75 pages

See all documents · Download with Pro

More from this agency

Closing soon near Savannah