2027 Parking Lot and Pedestrian Walkway Repairs
Minnesota StateBloomington, Minnesota#10451158
This is a construction project to repair and resurface a parking lot and pedestrian walkway at a Minnesota State facility in Bloomington. Work includes concrete pavement removal, repair, and resurfacing; bituminous patching and coating; curb repair; and pavement rehabilitation. Bids must be submitted by 2:00 PM CST on December 16, 2026, via the QuestCDN portal.
On PublicBidSearch: the original bid posting for this bid.
Overview
- Due
- Dec 16, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 16, 2026, 2:00 PM Central Time
- Submission
- electronic portal
Scope of work
- Remove and replace damaged concrete pavement
- Repair and resurface existing concrete surfaces
- Apply bituminous patching and coating to damaged areas
- Repair and replace curbs and edges
- Rehabilitate existing pavement and drainage
Steps to Bid
- 1
Register on the QuestCDN portal if not already registered.
- 2
Review the full solicitation and documents at Official linkPro.
- 3
Submit the bid response via the QuestCDN portal by 2:00 PM CST on December 16, 2026. by Dec 16, 2026, 2:00 PM
What you'll need
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Work will be performed on existing infrastructure at an educational facility. The project is classified as construction. Bidders must be qualified to perform concrete and asphalt paving work. The work site is located in Bloomington, Minnesota. Submissions must be delivered via the QuestCDN portal. No funding source or estimated value is stated.
Key dates
- Bids due
- Dec 16, 2026, 2:00 PM CT
More from this agency
- CLC/Brainerd 1995 A1-A4 Roof Replacement — closes Nov 30, 2026
Similar open bids
- Big Spunk Rest Area Parking Lot Replacement & Expansion — Minnesota DOT
- Woodland Ground Storage Reservoir Upgrade — City of Duluth
- Harvest Park Phase 2 Implementation — City of Maplewood
- Thunder Bay Park Boardwalk Replacement — City of Little Canada
- Replacement of Bridge 7731 (County Bridge 478) with Precast Concrete Box Culverts and Approach Road Work on CSAH 61 — St. Louis County
Closing this week nearby
- I-494 in Maple Grove to East of TH 252 in Fridley - Sign Replacement — closes Nov 18, 2026
- I-494 in Maple Grove to east of TH 252 in Fridley - Sign Replacement — closes Nov 18, 2026
- Retrofit Railing on Bridge 4190 (Mendota Bridge), Trunk Highway 55/62 Over the Minnesota River — closes Nov 18, 2026
- Resurfacing of State Highway 59 from TH 14 to 0.61 Miles South of TH 23 and State Highway 167 from Cul-de-Sac to TH 23… — closes Nov 18, 2026
- MnDOT SP 1115-28: CR 1 S in Pillager to TH 10 in Motley - Mill & Overlay, Roundabout Construction, and Bridge… — closes Nov 18, 2026