Hot Mix Asphalt Reconstruction, Drainage, Shared-Use Path, Concrete Curb and Sidewalk, Box Culvert Replacement, Guardrail, Geotechnical Work, Signage, and Pavement Markings on M-66 from South of Tuttle Road to Wells Street, Ionia, Ionia County, MI
Michigan Department of Transportation — MDOTMichigan#34032-214339
This project involves reconstruction of 2.10 miles of M-66 in Ionia County, MI, including hot mix asphalt paving, drainage, shared-use path, concrete curb and gutter, sidewalk, box culvert replacement, guardrail, geotechnical work, signage, and pavement markings. A 5-year materials and workmanship pavement warranty and a 2-year concrete surface coating warranty are included. A mandatory pre-bid meeting is scheduled for October 15, 2026, at 10:00 a.m. in Grand Rapids. The project is expected to be completed by June 9, 2028. Bids are due by December 4, 2026, at 10:30 a.m. in Lansing, MI.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 10:30 AM Eastern Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 2
Scope of work
- Drainage improvements and stormwater management
- Construction of a shared-use path along M-66
- Installation of guardrail and safety barriers
Steps to Bid
- 1
Review the full solicitation package, including plans, specifications, and addenda, available online at Official linkPro.
- 2
Attend the mandatory pre-bid meeting on Thursday, October 15, 2026, at 10:00 a.m. at the MDOT Grand Rapids TSC Office, 2660 Leonard Street NE, Grand Rapids, MI 49525. was Oct 15, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit a bid proposal, including a bid bond, bid form, and all required documentation, by the due date and time. by Dec 4, 2026, 10:30 AM
What you'll need
Contract duration
6/9/2028
Submission
Mail, Hand delivery
NAICS
237131
How to submit
Bids must be submitted in a sealed envelope, clearly marked with the contract number and project title. The envelope must be delivered to the MDOT Bid Office at the address above by 10:30 a.m. on December 4, 2026. Late submissions will not be accepted.
In person/mail: 425 W. Ottawa St., Lansing, MI 48933
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Mandatory pre-bid meeting on Thursday, October 15, 2026, at 10:00 a.m. at the MDOT Grand Rapids TSC Office, 2660 Leonard Street NE, Grand Rapids, MI 49525. Completion date: June 9, 2028. Required SBP participation: 0.00%. Estimated plans pages: 315.
Key dates
- Pre-bid meeting
- Oct 15, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 4, 2026
Documents
- ads.pdf13 pages
- ads.pdf11 pages
More from this agency
- 2.77 mi of Hot Mix Asphalt Shared-Use Path and Mid-Block Pedestrian Crossing with Concrete Sidewalk Ramps Upgrades in… · closes Dec 4, 2026
- Concrete Roadway Reconstruction, Water Main, Drainage, Guardrail, Traffic Signals, Signing, Bridge Rehabilitation, and… · closes Dec 4, 2026
- Bridge Reconstruction on M-28 over Tributary to Laughing Whitefish River, Alger County, Including Culvert Removal and… · closes Dec 4, 2026
- Clearing of Clear Zones on M-66 from M-60 to Glenn Cross Road, Branch and Calhoun Counties · closes Dec 4, 2026
- 5.44 mi of concrete crack sealing, joint resealing, asphalt repair mastic, pavement repairs, and pavement markings on… · closes Dec 4, 2026
Similar bids in Michigan
- Roadway Reconstruction and Bridge Replacement on M-49 in Camden, Hillsdale County, Michigan · closes Dec 4, 2026
- Reconstruction of Big Rapids Rest Area, US-131SB South of M-20, Mecosta County · closes Dec 4, 2026
- Traffic signal modernization and concrete sidewalk ramp upgrades in Fowler, Grand Ledge, Eaton Rapids, and… · closes Dec 4, 2026
- 0.31 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, traffic signal,… · closes Dec 4, 2026
- 0.87 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, signing, and… · closes Dec 4, 2026
Closing soon in Michigan
- Audio Visual Web Conferencing Services — Request for Proposals · closes Dec 1, 2026
- DKDC HVAC Upgrades · closes Dec 1, 2026
- Exhibit D-6 - Iran Economic Sanctions Act Compliance Affidavit · closes Dec 1, 2026
- Fenton School Auditorium Addition & Renovation · closes Dec 3, 2026
- 2023 Bond - Phase 6 HS Fire Alarm/Gym Renovations · closes Dec 4, 2026