Reconstruction of Big Rapids Rest Area, US-131SB South of M-20, Mecosta County
Michigan Department of Transportation — MDOTMichigan#54014-213323
Work includes removal and replacement of the existing building, concrete curb and sidewalks, signing, and parking pavements. The bid due date is December 4, 2026, at 10:30 AM local time, to be submitted at 425 W. Ottawa St., Lansing, MI 48933. The project completion date is November 19, 2028.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 10:30 AM Eastern Time
- Submission
- hand delivery
- Documents analyzed
- 1
Scope of work
- Remove and replace existing rest area building
- Construct new concrete curb and sidewalks
- Install signing and pavement markings
- Reconstruct parking pavements on US-131SB
- Work located just south of M-20, Mecosta County
Steps to Bid
- 1
Register with MDOT eProp system to access plans and specifications.
- 2
Review the project plans and specifications available online at <Official linkPro>.
- 3
Submit a bid proposal by December 4, 2026, at 10:30 AM local time, to 425 W. Ottawa St., Lansing, MI 48933. by Dec 4, 2026, 10:30 AM
What you'll need
Contract duration
11/19/2028
Submission
Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
Project includes a 5363 Fa net classification. Required SBP participation: 4.00%. Estimated plans pages: 139.
Key dates
- Pre-bid meeting
- Oct 15, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 4, 2026
Documents
- ads.pdf33 pages
More from this agency
- Traffic signal modernization and concrete sidewalk ramp upgrades in Fowler, Grand Ledge, Eaton Rapids, and… · closes Dec 4, 2026
- Hot Mix Asphalt Reconstruction with Roundabout, Storm Sewer, and Sidewalks on M-59 at Latson Road, Livingston County · closes Dec 4, 2026
- 5.07 mi of Hot Mix Asphalt Cold Milling, Resurfacing, Shoulder Widening, Drainage Improvements, Guardrail… · closes Dec 4, 2026
- Installation of pedestrian hybrid beacon, pedestrian countdown signals, new sidewalk and pavement markings on Squirrel… · closes Dec 4, 2026
- 9.88 mi of chip seal, single and fog seal, and overband crack seal joints on M-60 from west of Corey Lake Road to west… · closes Dec 4, 2026
Similar bids in Michigan
- 0.31 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, traffic signal,… · closes Dec 4, 2026
- 0.87 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, signing, and… · closes Dec 4, 2026
- Pedestrian crossing improvements, rectangular rapid flashing beacons, concrete curb and gutter, sidewalk ramps, and… · closes Dec 4, 2026
- 0.51 mi of Hot Mix Asphalt Cold Milling and Resurfacing, Storm Sewer, Concrete Curb, Gutter, Sidewalk, Ramps, Signing,… · closes Dec 4, 2026
- 7.48 mi of traffic signal modernization, signing, concrete sidewalk and ramps on Joy Road from Fielding Street to Ohio… · closes Dec 4, 2026
Closing soon in Michigan
- MDHHS DDS-226-K Business Reply Booklet Envelope · closes Dec 1, 2026
- Submersible Sump Pump Procurement for City of Niles Wastewater Treatment Plant · closes Dec 2, 2026
- Huron Intermediate School District Classrooms Addition · closes Dec 3, 2026
- Employee Benefits Consulting Services · closes Dec 4, 2026
- Asbestos Abatement at Morenci Elementary School and Morenci Junior/Senior High School · closes Dec 4, 2026